Laserfiche WebLink
CITY OF IRVINE ON -CALL CONSULTANT <br />SERVICES <br />Yale Avenue: Leading the visioning efforts on Yale Avenue, re -allocating <br />space within the right-of-way to provide a new high quality, low stress <br />active transportation corridor in the City. Work will include the preliminary <br />engineering and preparation of the environmental document. <br />Walnut Avenue/The Mall Traffic Signal Improvements: Mark Thomas is <br />providing final design of a new traffic signal, striping enhancements, ADA <br />upgrades and bicycle and pedestrian improvements at the Walnut Avenue/ <br />The Mall intersection. <br />Bake Parkway/Jeronimo Road Intersection Widening: Mark Thomas is <br />preparing a project report and environmental document for the widening of <br />the Bake Parkway and Jeronimo Road intersection. Work included a traffic <br />study and preliminary engineering for the including of additional left and right <br />turn lanes, bike lanes, widening, utility and right-of-way impacts, and traffic <br />signal modifications <br />Jeffrey Road/Irvine Center Drive Widening: Mark Thomas is preparing <br />the PS&E for the widening of the Jeffrey Road/Irvine Center Drive (ICD) <br />intersection. The improvements will add through, left turn and right turn <br />capacity. Class II bicycle facilities will be provided in each direction. Work <br />includes utility relocation and right-of-way acquisition. <br />CITY OF MONTEBELLO ON -CALL SERVICES <br />Systemic Safety Analysis Report: Prepared the citywide SSAR, identifying <br />12 priority locations that included countermeasures, conceptual layouts and <br />cost estimates. <br />Montebello Boulevard Median Islands & Rehabilitation: Preparing of <br />the PS&E for the addition of new raised landscaped medians on 1.2 miles <br />segment of Montebello Blvd. Project includes the asphalt rehabilitation, ADA <br />ramp upgrades, planting and irrigation. <br />Beverly Boulevard Rehabilitation: Preparation of PS&E for the <br />rehabilitation fo a 0.8 mile segment of Beverly Boulevard. Work includes <br />pavement rehabilitation, ADA upgrades and signing & striping improvements. <br />Plan Checking Services: Reviewing third -party street, grading, utility, storm <br />drain, sewer plans and reports for projects city-wide, including the new <br />Montebello Hills residential tract, the USACE realignment of Lincoln Avenue, <br />and the widening of the Garfield/Wilcox intersection. <br />As -Needed Survey: Reviewing parcel and tract maps, preparing legal <br />descriptions and plats, assisting on clearing ownership issues. <br />Senior Center Remodel: Preparing the remodel plans for the lower level of <br />the Senior Center to provide more flexibility for activity and storage areas. <br />Montebello Park Baseball Field Upgrade: Preparing PS&E for replacing <br />sunken dugouts with surface dugouts, new bleachers, upgrade irrigation <br />system. <br />ON -CALL ENGINEERING SERVICES <br />City of Santa Ana <br />MARK THOMAS <br />Page 17 <br />