My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (2)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:05:19 PM
Creation date
6/26/2023 3:54:33 PM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2023-088-05
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
7/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.7 Stormwater Quality <br />Prepare a Water Quality Management Plan (WQMP) per the City and Regional Water Quality Control <br />Board requirements. <br />2.8 Traffic Analysis <br />The Mark Thomas team will conduct AM peak and PM peak period intersection turning movement counts <br />including bicycles and pedestrians and daily arterial volume counts at the intersection and compare to <br />historical counts. Intersection Capacity Utilization (ICU) calculations will be performed and checked for <br />deficiencies with and without the proposed improvements. Turning volumes will be input to Synchro and a <br />SimTraffic simulation performed to establish the potential length of turn -pockets. <br />TASK 2 DELIVERABLES <br />» Project Control, Aerial Photogrammetry, Topographic Base Map (Microstation format) <br />» Right-of-way Mapping <br />» Utility Coordination, Mapping, Potholing and Tracking Matrix <br />» Draft and Final Reports for Tasks 2.5-2.8 <br />TASK 3 - ENVIRONMENTAL COMPLIANCE & REGULATORY <br />PERMITTING <br />3.1 CEQA Clearance <br />On State or locally funded projects, the Mark Thomas team will prepare the necessary environmental <br />document in compliance with the California Environmental Quality Act (CEQA). This includes the <br />preparation of the Notice of Exemption for a Categorical Exemption (CE), Initial Study (IS) leading to a <br />Negative Declaration (ND) or Mitigated Negative Declaration (MND) or an Environmental Impact Report <br />(EIR). The City would be the lead agency reviewing and approving these documents. <br />3.2 NEPA Clearance <br />On Federally funded projects, an environmental document would be prepared in conformance with <br />the National Environmental Policy Act (NEPA), with Caltrans being the led agency for NEPA approval. <br />This would include the preparation of the Categorical Exclusion, (CE), Environmental Assessment (EA) <br />leading to a Finding of No Significant Impact (FONSI) or an Environmental Impact Study (EIS). <br />3.3 Technical Studies/Memorandums <br />Supporting technical studies will be prepared as necessary in support of the environmental document. <br />Preparation of one draft and one final analyses/memorandum/report for each potential topic, as needed, <br />are included below: <br />» Cultural Resources <br />» Paleontological Resources <br />» Biological Resources <br />» Jurisdictional Delineation <br />» VMTAnalysis <br />» Noise and Vibration Impact Analysis <br />» Air Quality and Greenhouse Gas Emission Analysis <br />» Phase 1 Initial Site Assessment (ISA) <br />ON -CALL ENGINEERING SERVICES MARK THOMAS <br />City of Santa Ana Page A-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.