My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (2)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:05:19 PM
Creation date
6/26/2023 3:54:33 PM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2023-088-05
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
7/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 Regulatory Permitting: <br />Regulatory permitting applications will be prepared as necessary to support the task orders, including, but <br />not limited to: <br />» United States Army Corps of Engineers (USAGE) Section 404 Permit for the Clean Water Act (CWA) <br />» Regional Water Quality Control Board (RWQCB) Section 401 Water Quality Certification <br />» California Fish and Game Code Section 1602 Streambed Alteration Notification <br />TASK 3 DELIVERABLES: <br />» CEQA Environmental Documentation <br />» NEPA Environmental Documentation (if needed) <br />» Draft & Final Technical Studies/Memorandums <br />» Regulatory Permitting <br />TASK 4 - DESIGN SERVICES <br />4.1 Project Plans <br />Mark Thomas will prepare plan submittals at the 35% conceptual level, 65%, 95%, and 100% completion <br />levels. Consultant submittals to City and other applicable agencies or stakeholders shall be complete <br />and shall include all necessary plans, special provisions, estimates, reports, and documents for PS&E <br />approval. <br />Mark Thomas will track and respond to each plan check comment in a matrix to minimize the number <br />of plan check cycles required to achieve approved plans. Plans will be prepared in Microstation and <br />submittals will be made electronically in PDF format. A listing of plans that may be required include: <br />» Title/General Notes Sheets <br />» Construction Details <br />» Typical Cross Sections <br />» Plan and Profile <br />» Grading Plans <br />» Utility Composite Plans and Details <br />» Drainage Plan, Profiles and Details <br />» Construction Staging/Traffic Handling <br />» Sign and Striping Plans <br />» Traffic Signal/ITS Plans <br />» Street Light Plans <br />» Retaining Wall Plans <br />» Structure Plans <br />» Landscape and Irrigations Plans <br />4.2 Special Provisions <br />Develop technical specifications as Special Provisions in conformance with American Public Works <br />Association (APWA) Green Book format, including necessary Caltrans standards and specifications, and <br />provide copies of required permits and reference standard plans/materials to be inserted into the City's <br />contract bid documents. <br />MARK THOMAS ON -CALL ENGINEERING SERVICES <br />Page A-12 City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.