Laserfiche WebLink
4.3 Quantities & Cost Estimates <br />Provide a construction quantity take -off list broken down by sheet and an updated cost estimate for each <br />plan check submittal and a final engineer's estimate of the project cost. The quantity calculations will be <br />clear as to where the specific items are located, i.e., reference to station/offset or other method. Source <br />of cost information and justification of bid item unit prices will be provided. <br />4.4 Right -of -Way Engineering <br />A right-of-way requirements map will be prepared, as required, to identify any permanent or temporary <br />right-of-way needs for the project. Preliminary Title Reports will be obtained, and legal descriptions and <br />plats prepared identifying the area to be acquired. A Record of Survey will be prepared and files, as <br />necessary. <br />TASK 4 DELIVERABLES: <br />» 35% Conceptual Plans <br />» PS&E submittals in PDF format at 65% and 100% (Final) Submittals <br />» Special Provisions in Word and PDF format at 65% and 100% (Final) Submittals <br />» Quantity and Cost Estimates in Excel and PDF format at 65% and 100% (Final) Submittals <br />» Response to Comments Matrix (PDF) at each submittal <br />» Right-of-way requirements map <br />» Legal Descriptions and Plats <br />» Record of Survey <br />City of Newport Beach - Bayside Drive Improvements <br />ON -CALL ENGINEERING SERVICES <br />City of Santa Ana <br />MARKTHOMAS <br />Page A-13 <br />