My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (2)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:05:19 PM
Creation date
6/26/2023 3:54:33 PM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2023-088-05
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
7/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3 Quantities & Cost Estimates <br />Provide a construction quantity take -off list broken down by sheet and an updated cost estimate for each <br />plan check submittal and a final engineer's estimate of the project cost. The quantity calculations will be <br />clear as to where the specific items are located, i.e., reference to station/offset or other method. Source <br />of cost information and justification of bid item unit prices will be provided. <br />4.4 Right -of -Way Engineering <br />A right-of-way requirements map will be prepared, as required, to identify any permanent or temporary <br />right-of-way needs for the project. Preliminary Title Reports will be obtained, and legal descriptions and <br />plats prepared identifying the area to be acquired. A Record of Survey will be prepared and files, as <br />necessary. <br />TASK 4 DELIVERABLES: <br />» 35% Conceptual Plans <br />» PS&E submittals in PDF format at 65% and 100% (Final) Submittals <br />» Special Provisions in Word and PDF format at 65% and 100% (Final) Submittals <br />» Quantity and Cost Estimates in Excel and PDF format at 65% and 100% (Final) Submittals <br />» Response to Comments Matrix (PDF) at each submittal <br />» Right-of-way requirements map <br />» Legal Descriptions and Plats <br />» Record of Survey <br />City of Newport Beach - Bayside Drive Improvements <br />ON -CALL ENGINEERING SERVICES <br />City of Santa Ana <br />MARKTHOMAS <br />Page A-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.