My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (6)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:05:59 PM
Creation date
6/26/2023 3:55:45 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2023-088-06
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/2/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PSOMAS <br />Rates are valid through June 30, 2024 <br />Project Director/Principal-in-Charge........... <br />Contract Manager/Senior Project Manager <br />Project Manager II ...................................... <br />Project Manager I ....................................... <br />Senior Project Engineer .............................. <br />Project Engineer ......................................... <br />Civil Engineering Designer III ..................... <br />Civil Engineering Designer II ...................... <br />Civil Engineering Designer I ....................... <br />Design Engineer I ....................................... <br />Survey Senior Project Manager .................. <br />Survey Project Manager/Manager.............. <br />Survey Senior Project Surveyor, PLS......... <br />Project Surveyor, PLS................................. <br />Surveyor, PLS or LSIT................................ <br />Survey Technician ...................................... <br />GISManager .............................................. <br />GIS Technician ........................................... <br />Senior CAD Technician .............................. <br />CAD Technician .......................................... <br />Land Use Entitlement Manager .................. <br />Plan Reviewer ............................................. <br />Permit Tech I .............................................. <br />Permit Tech II ............................................. <br />ADA Compliance/Access Specialist........... <br />Senior Environmental Project Manager...... <br />Environmental Project Manager ................. <br />Environmental Analyst ................................ <br />$290 <br />Cultural Resources Manager............................$175 <br />$275 <br />Cultural Resources Technician .........................$105 <br />$250 <br />Biological Resources Manager ........................ <br />$234 <br />.$215 <br />Regulatory Permitting Manager ....................... <br />$220 <br />$205 <br />Senior Restoration Ecologist............................$196 <br />.$190 <br />Senior Biologist.................................................$163 <br />.$150 <br />Biologist............................................................$145 <br />.$140 <br />Senior GIS Analyst...........................................$167 <br />.$130 <br />Technical Writer ............................. ................... <br />$128 <br />.$105 <br />Planner.............................................................$170 <br />$260 <br />Senior Resident Engineer ................................ <br />$225 <br />.$210 <br />Resident Engineer II ........................................ <br />$205 <br />.$195 <br />Resident Engineer I..........................................$185 <br />.$190 <br />Senior Structures Representative .................... <br />$225 <br />.$180 <br />Structures Representative II ............................ <br />$205 <br />.$155 <br />Structures Representative I..............................$185 <br />$260 <br />Senior Construction Manager .......................... <br />$220 <br />.$100 <br />Construction Manager ll.................................. <br />$200 <br />.$165 <br />Construction Manager I....................................$180 <br />.$145 <br />Senior Inspector .............................................. <br />$200 <br />$275 <br />Inspector........................................................... <br />$185 <br />.$190 <br />Scheduler.........................................................$170 <br />.$170 <br />Office Engineer ............................................ <br />..... $160 <br />.$150 <br />Labor Compliance............................................$125 <br />.$190 <br />Project Assistant/Administration .......................$125 <br />$245 <br />Engineering Assistant, Intern ............................ <br />$110 <br />.$187 <br />Administrative Support ...................................... <br />$95 <br />.$145 <br />Standard computer and technology costs are incorporated into these hourly rates, as well as direct <br />labor, overhead, fringe benefits and fee. <br />► Rates include miscellaneous related costs: vehicle, cell phone, digital camera, and standard tools <br />and equipment. All other direct expenses will be billed at cost. <br />The above schedule is for straight time. Overtime for Construction Management/Inspection and <br />Surveying services will be charged at 135 percent of the regular hourly rate. Sundays and holidays <br />will be charged at 170 percent of the regular hourly rate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.