My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC. (2)
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:06:37 PM
Creation date
6/26/2023 3:56:46 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2023-088-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
1/1/2025
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewage Lift Station Technical Approach <br />• Review of system hydraulics and pump selection <br />• Lift station control strategies and integration into SCADA system <br />• Integration into energy management system and time of use <br />pumping <br />• Electrical/instrumentation requirements <br />• Power supply and standby power <br />• Site selection and acquisition <br />• Seismic/structural issues <br />• Corrosion issues, specialty coatings and materials <br />Odor control <br />Operation and maintenance issues <br />Contracting strategies, scheduling, and budget control <br />• Noise, aesthetics, and community concerns <br />• Safety pre -use analysis <br />• Emergency storage <br />Pump Station Technical Approach <br />• Review of system hydraulics and pump selection <br />• Booster station control strategies and integration into SCADA <br />system <br />• Integration into energy management system and time of use <br />pumping <br />• Electrical/instrumentation requirements <br />• Power supply and standby power <br />• Site selection and acquisition <br />• Seismic/structural issues <br />• Corrosion issues, specialty coatings and materials <br />• Operation and maintenance issues <br />• Contracting strategies, scheduling, and budget control <br />• Noise, aesthetics, and community concerns <br />• Safety pre -use analysis <br />Storage Facility Technical Approach <br />• System hydraulics <br />• Tank type <br />• Site configuration <br />• Geotechnical/foundation conditions <br />• Earthwork and grading <br />• Water quality and circulation <br />• Operational and maintenance requirements <br />• Safety features for roof access and confined space entry <br />• Integration into SCADA system <br />• Stormwater control facilities <br />• Visual aesthetics <br />• Traffic and noise impacts during construction <br />Special Considerations for Wastewater Facilities <br />• Pumping of solids and miscellaneous materials such as rags must <br />be addressed in the lift station planning and mechanical design. <br />• Configuring facilities to properly handle planned discharges <br />such as wash down, as well as unplanned discharges like <br />overflows, must respect regulatory constraints and may require <br />special features to control flows (e.g.. discharge to a sewer). <br />Compliance with regulatory requirements, coupled with early <br />coordination with regulators, is paramount to smooth project <br />approval. <br />Maintaining facilities in service during construction. <br />Special Considerations for Non -Potable Facilities <br />• Stored water quality can be more difficult to maintain and <br />therefore requires special attention regarding the tank volume, <br />residence time in the tank and circulation. <br />• A higher degree of settlement in storage facilities can lead to <br />the need for more frequent and special equipment for clean -out <br />operations. <br />• Configuring facilities to properly handle planned discharges <br />such as wash down, as well as unplanned discharges like tank <br />overflows, must respect regulatory constraints and may require <br />special features to control flows (e.g., discharge to a sewer). <br />• Compliance with regulatory requirements, coupled with early <br />coordination with regulators, is paramount to smooth project <br />approval. <br />PROJECT MANAGEMENT APPROACH <br />We've derived our project management approach from many years <br />of experience and proven success, and it includes very specific <br />strategies: coordination, communication, and documentation. <br />COORDINATION: All task orders require coordination. This <br />may include coordination with other City departments, local <br />agencies, and stakeholders. The Ardurra team has years <br />of experience with major on -call contracts with Southern <br />California agencies. These on -call contracts require similar <br />coordination efforts in which Ardurra has established and <br />maintained outside -agency contacts, coordinated the <br />designs with their staff, and received the approvals to move <br />the project forward. This knowledge and understanding of <br />working with other agencies provides great benefit to you for <br />each project. <br />COMMUNICATION: Ardurra has a formal, proactive <br />communication plan to share critical project information as <br />soon as possible and to make sure there are no surprises. <br />We continuously report progress, identify problems, assign <br />priorities, receive feedback, and document progress. From <br />project start-up through project closeout, we will prioritize <br />our communication to make sure we document and address <br />all required actions timely. We assure you that your team <br />and our team will always know the status of your projects. <br />This level of coordination, coupled with the project progress <br />meetings, helps avoid project issues and delays, and <br />ensures that the project is on schedule and within budget. <br />Ardurra has used this management approach with great <br />success on all types and sizes of projects. <br />City of Santa Ana I March 14, 2023 <br />On -Call Engineering Services, RFP No. 23-030 <br />/\/ARDURRA <br />
The URL can be used to link to this page
Your browser does not support the video tag.