Laserfiche WebLink
k, i <br />DOCUMENTATION: Proper documentation is critical for <br />all projects. We have a thorough understanding of the <br />document control procedures required for civil engineering <br />and other types of projects for a variety of funding sources. <br />Ardurta's document control management policies comply <br />with the City's requirements. Our typical monthly project <br />progress reports include the status of deliverables, utility <br />and outside -agency efforts, cost and schedule snapshot and <br />analysis, issues discussion, and recommended resolution <br />actions. We will tailor monthly progress reports to the <br />City's needs for each project. In combination, Ardurra's <br />tools and efficiency in coordination, communications, and <br />documentation provide the City with a transparent process <br />for the duration of the contract. <br />Quality Assurance and Quality Control <br />QAIQC is an ongoing task throughout the duration of the project. <br />Ardurra takes seriously the responsibility for the accuracy <br />and completeness of our work products. We base our QAIQC <br />Program upon the belief that nothing is more important than <br />design quality. <br />Quality control refers to quality -related activities associated with <br />the creation of the project deliverables. Quality control is used <br />to verify that deliverables are of acceptable quality and that they <br />are complete and correct. Ardurra quality control activities include <br />deliverable peer reviews and the plan check process. <br />Quality control is the check or analysis that determines the <br />acceptability of the project deliverables. Tasks related to quality <br />control will include documented reviews of reports, drawings, <br />specifications and opinions of cost, independent review of <br />calculations, etc. Quality control reviews will occur with each <br />submittal. <br />The Ardurra quality control program also compares the project <br />deliverables against the original scope of work, project objectives <br />and client expectations, which were developed before the <br />project started. Ardurra quality control is a work product -based <br />approach. We check whether the deliverables satisfy the quality <br />requirements and the scope of work. Depending upon the results, <br />the design team will take suitable corrective action. Quality control <br />begins once the project design begins. <br />Based on the City's requirements and standards developed during <br />the quality assurance process, the quality control team checks <br />whether the work products (reports, plans, specifications, cost <br />estimates, etc.) meet all those requirements with each submittal. <br />Our project manager and quality assurance manager will develop <br />and implement a project -specific QAIQC plan. This plan includes <br />project -specific checklists to verify quality throughout the project. <br />The quality control manager for the project ensures that the <br />project manager addresses all checklist items. Besides quality <br />Ardurra provides several layers n[ quality control, <br />assuring that all project needs are met. <br />control by the project manager, a quality control committee <br />comprising at least two registered engineers who are not involved <br />in the project, will review the project documents. The review <br />committee will do a technical evaluation of the calculations, <br />plans, cost estimate, and the project specifications. The review <br />committee submits comments to the project manager for review <br />during a subsequent meeting. We will make the results of our <br />in-house QAIQC plan available for review by the City and the <br />entire Ardurra team. <br />We have the added benefit of providing constructability <br />review by our construction management group as a standard <br />practice. Their review comes from the contractor's perspective <br />and synchronizes the construction documents to eliminate <br />potential change orders. <br />Schedule <br />Our project manager will prepare and maintain a Microsoft Project <br />schedule. Our project manager will use the schedule, task lists, <br />deliverables, agency review time, and progress reports to list <br />each task in the project. This reinforces accountability throughout <br />our design team. We will provide a summary report regularly <br />that shows tasks completed, items that may have changed, and <br />schedule updates, if needed. <br />Deliverables <br />Ardurra will provide plans, specifications, and estimates for the <br />improvement projects. Upon completion of projects, Ardurra will <br />provide the City with as -built documents for its records. <br />Additional deliverables include topographic maps and/or ALTAs, <br />where necessary, including the raw survey data. For studies, <br />Ardurra will provide the City with technical reports that include all <br />the necessary backup data and citations. <br />/\/ARDURRA <br />City of Santa Ana I March 14, 2023 <br />On -Call Engineering Services, RFP No. 23-030 <br />