My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC. (2)
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:06:37 PM
Creation date
6/26/2023 3:56:46 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2023-088-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
1/1/2025
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
meeting with Orange County Public Works staff to discuss <br />the most up-to-date planning for the Federal Storm Channel <br />and to identify the interim and ultimate conditions for the <br />confluence with the Federal Storm Channel. Work also <br />included hydraulic analyses of the existing system with the <br />5, 10, 25, and 100-year storm flows to establish existing <br />level of protection and facility constraints. Ardurra developed <br />alternative enclosed facilities (box culverts and pipes) to <br />handle the runoff from the 100-year storm event. Cost <br />estimates were prepared including design, construction, and <br />contract administration/inspection for each alternative. <br />On -Call Civil Engineering Services for Various Public <br />Works Projects I City of La Habra <br />Contact: Tony An, Principal Engineer; 562.383.4158; <br />tanglahabraca.gov <br />Services: Engineering Design <br />Start:05/2017 Complete: Ongoing <br />Team Members: Anissa Voyiatzes (PIC); Jose Hernandez (PM); <br />Joe Buckner (Roadway); Miguel Hurtado (Design Engineer) <br />Ardurra is providing professional engineering services on <br />an as -needed basis in support of the La Habra Engineering <br />Division on a variety of Public Works Department projects <br />for the FY 2016-2021. Work includes construction of street <br />improvements, waterline improvements, sewer improvements, <br />storm drains improvements, traffic signal improvements, City park <br />improvements, and building facilities improvement. The City has <br />budgeted approximately $26 million in the Capital Improvement <br />Program. The CIP projects will be funded with a variety of funding <br />sources, and in addition to local funding sources, some projects <br />may be funded by Community Development Block Grant, State <br />and Federal -Aid Grant. Typical projects that Ardurra has worked <br />on include residential street rehabilitation; intersection widening; <br />curb, gutter, and sidewalk replacement; storm drain improvement; <br />and waterline upgrades. <br />■ Residential Streets Rehab (2018119). Provided <br />construction documents for over 8 miles of roadway <br />improvements, street resurfacing, and water main upgrades. <br />Ardurra has prepared all PS&E as required for bidding and <br />construction of the proposed improvements. The plans <br />include roadway rehabilitation, replacement of a significant <br />number of ADA non -compliant ramps at many intersections, <br />and traffic signing and striping. <br />■ Three Arterial Rehabs (2019/21). Prepared construction <br />documents for 3 miles of arterial street rehabilitations <br />including all PS&E for bidding and construction of the <br />proposed improvements. The intent of this project is to <br />renovate roadway pavement and reconstruct deteriorated <br />concrete improvements. <br />■ La Habra Boulevard (Valley Home Avenue to Beach <br />Boulevard), Cypress Street (La Habra Boulevard <br />to Whittier Boulevard), and Palm Street (La Habra <br />Boulevard to northerly City limits). Prepared PS&E for <br />approximately 2 miles of street rehabilitation for these three <br />arterial streets. The roadway rehabilitation treatments varied <br />from R&R damaged sections of asphalt concrete pavement; <br />cold mill and fill with base and surface course AC, to Type <br />II slurry. Additionally, <br />Ardurra field -walked the <br />segment to identify PCC <br />R&Rs for curb, gutter, <br />sidewalk ADA ramps, <br />and driveways. Included <br />within the plan set was <br />replacement striping for <br />the three segments. <br />■ La Habra Boulevard Improvements (Beach Boulevard <br />to Idaho Street). Prepared PS&E for this roadway <br />rehabilitation project to remove and replace damaged <br />sections of asphalt concrete pavement; base paving <br />with an ARHM cap. Additionally, Ardurra Feld -walked the <br />segment to identify PCC R&Rs for curb, gutter, sidewalk <br />ADA ramps, and driveways. Signing and striping plans were <br />prepared, and bike lanes were added for both east and <br />westbound directions. Also, coordinated with and obtained <br />an encroachment permit through Caltrans for replacement <br />of loops at Beach Boulevard. <br />On -Call Municipal Engineering ( City of Lake Forest <br />Contact: Tom Wheeler, Director of Public Works/City Engineer; <br />949.461.3480; twheeler@lakeforestca.gov <br />Services: Engineering, Program Management, Project <br />Management, Traffic Engineering, Flood Control <br />Start:06/2011 Complete:0612024 <br />Team Members: Lisa Penna (PIC); Dennis Joe (Program <br />Manager); Mark Lewis (Traffic/Transportation Engineering); <br />Joe Buckner and Miguel Hurtado (Project Engineers); Omar <br />Alameddine (Inspections Manager); Keith Forbes, John Dela <br />Cruz, and Chip Vanderbeek (Subdivision Improvements/Grading) <br />Ardurra has a multi -year contract to provide municipal engineering <br />services. Under this on -call contract, Ardurra has performed <br />plan checking and reviews for the following: entitlement review; <br />subdivision maps; hydrology and hydraulics reports; street <br />improvement plans; grading plans; water quality management <br />plans and encroachment permits. <br />Work has included project management for 12 projects <br />and funding analysis for a transportation funding program. <br />Tasks include reviewing land use applications; plan checking <br />development plans and maps; inspecting approved land <br />/\/ARDURRA <br />City of Santa Ana I March 14, 2023 <br />On -Call Engineering Services, RFP No.23-030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.