Laserfiche WebLink
development construction; inspecting approved work in the public <br />right-of-way; public works encroachment permit inspection; water <br />quality program management; and providing additional staff on an <br />as -needed basis. <br />Primary services have involved engineering implementation of <br />the City's Opportunity Studies Area (OSA) that comprises five <br />developments totaling over 4,000 housing units; design of the <br />Los Alisos Boulevard resurfacing project; conducting the annual <br />sidewalk survey; and inspection of the catch basin insert project. <br />The OSA projects involve plan check and inspection of all facets <br />0:k6 of development including map approval; rough grading; precise <br />grading; street and storm drain improvements; park development; <br />and median and parkway improvements. Other land development <br />projects have been approved other than the five OSA projects, <br />including The Meadows, Parkside, Encanto, and residential <br />housing in the Auto Center. <br />There are currently four major residential development projects <br />within the city. Over the course of three years (2021-2024), it is <br />expected that all four projects will be completed. Once completed, <br />approximately 5,000 new residential units would have been <br />constructed. <br />On -Call Engineering I South Coast Water District <br />Contact: Taryn Kjolsing, Engineering Manager; 949.342.1154; <br />tKjolsing@scwd.org <br />Services: Design Engineering <br />Start:2021 Complete: Ongoing <br />Team Members: Aric Gnesa (PM); Viet Duy Vo (Design <br />Engineer); Lori Trottier (Environmental Lead) <br />Ardurra has worked on the following projects under its current <br />on -call contract with South Coast Water District: <br />■ 30 Acres Site Water and Sewer Facilities. South Coast <br />Water District plans to locate three new portable buildings <br />at the site for District's use as temporary office space. The <br />buildings require new water service, new sewer service, <br />and a new gravity sewer main to connect the site laterals <br />to existing sewer facilities approximately 500 LF south <br />of the building site. The project includes a civil site plan, <br />design of new electrical power service, and communications <br />connection to the District's Groundwater Recover Facility <br />with approximately 2,000 LF of new buried fiber optic. <br />■ LTM ReplacementlRepair Options at Calle Vista Torito. <br />The LTM is approximately 34,000 linear feet (6.5 miles) of <br />pipeline, ranging in size from 24 to 36 inches in diameter, <br />primarily constructed of concrete cylinder pipe (CCP). Due <br />to several recent leaks, the District identified four potential <br />repair, replacement or rehabilitation alternatives. The project <br />includes engineering services to evaluate these alternatives <br />with all pertinent factors, develop additional alternatives if <br />feasible, and provide recommendations. <br />Via Sacramento Water Main Improvements. This project <br />involves the replacement of approximately 560 LF of B-inch <br />ACP with 8-inch PVC pipe,10 services, 2 fire hydrants, <br />and 1 valve cluster. The existing pipeline is located in the <br />parkway off of Via Sacramento from Camino Capistrano <br />to Via Espinoza in <br />Dana Point. The <br />project includes design, <br />surveying, potholing, <br />and construction phase <br />services. The project <br />also involves developing <br />PS&E for the proposed <br />pipeline replacement. <br />Anaheim Public Utilities Department As -Needed <br />Engineering I City of Anaheim <br />Contact: David Watson, Project Manager; 310.864.2157; <br />dwatsonganaheim.net <br />Services: Design Engineering <br />Start:2019 Complete: Ongoing <br />Team Members: Rob Weber (PM), Patrick Mulvey (PM) <br />Under an as -needed engineering contract, Ardurra is currently <br />working on or recently completed the following projects for the <br />City of Anaheim: <br />Oak Hills Reservoir Recoating and Upgrades Project. <br />This project involves various improvements at the Oak <br />Hills Reservoir site, including recoating of the reservoir <br />exterior roof and spot repair of coating on the exterior <br />walls; reservoir safety upgrades; repairs to the reservoir <br />vents; modifications to the reservoir overflow to meet DOW <br />requirements; modifications <br />to the reservoir cathodic <br />protection system; <br />replacement of the <br />reservoir level sensor; <br />replacement of existing <br />valving and piping on the <br />inlet and outlet pipelines <br />to improve operation of <br />the reservoir and overall <br />water system; installation <br />of new onsite water and <br />sewer connections; and <br />remediation of ground <br />settlement issues in the <br />northwest corner of the <br />site. The project also <br />City of Santa Ana i March 14, 2023 <br />On -Cal) Engineering Services, RFP No. 23-030 <br />AVARDURRA <br />