My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWE (3)
Clerk
>
Contracts / Agreements
>
C
>
CWE (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:07:13 PM
Creation date
6/26/2023 3:58:23 PM
Metadata
Fields
Template:
Contracts
Company Name
CWE
Contract #
A-2023-088-08
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
12/8/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />On -Call Engineering Services (RFP No. 23-030) <br />The goal of CWE pre -construction services will be to establish smooth and successful <br />construction management services processes and communication channels. This includes <br />commitment of the key personnel who have previously worked together in successful delivery of <br />such services. The CWE Team brings a wealth of construction management experience and <br />expertise. CWE Team senior staff includes Resident Engineers and Office Engineers, and is <br />well versed in the challenges of construction of public works projects, such as safety, outreach, <br />traffic control, utilities, site constraints, materials testing and inspection. <br />In performing the construction management and inspection services, CWE will be an integral <br />part of the City's project team,., raring your mission, goals, and commitment of successful <br />project completion. The systems and procedures CWE will employ in providing the construction <br />management services have been successfully used in the completion of projects similar in <br />nature to those planned by the City. CWE Resident and Office Engineers will review the <br />Contractors' schedule, traffic control plan, safety plan, and SWPPP, and manage the entire <br />process through the use of a Program Controls/Electronic tracking system (PCS). Our review <br />takes into account their safety, access, and viability for each construction phase. CWE' <br />Resident and Office Engineers are familiar with Federal Highway Administration (FHWA) <br />requirements, and have implemented them on CWE construction management projects. For <br />those City projects that are federally funded, we will set up the project documentation consistent <br />with the federal requirements prior to the project start, and then implement and adhere to them <br />during construction. The PCS will also help manage contract/construction documents, agency <br />coordination, Critical Path Method (CPM) schedule variations, monthly updates, daily <br />inspections, submittals, RFIs/NCRs/change orders, and progress payments. <br />Construction Inspection <br />CWE can provide a full-time inspector throughout the construction phases of the project. CWE <br />will develop a quality control plan at the beginning of the project, in which all the forms related to <br />Quality Control will be identified and procedures for completing the forms will be included. <br />Tasks may include daily inspection logs and photos; daily safety and manpower monitoring; <br />reviewing materials submittals; coordination of inspections; material testing and coordination; <br />as -built maintenance, punch lists and closeouts. <br />CWE will coordinate and negotiate with all third -party stakeholders, including but not limited to, <br />utility owners and private property owners, in addition to contractor personnel and specialty <br />subconsultants. CWE's inspection and resident engineering services include complete <br />management and coordination of the site, project, and schedule. Any and all project related <br />matters will be handled by CWE inspection and resident engineer personnel efficiently and <br />expeditiously. Document control, document management, and daily/weekly reporting to the City <br />will ensure that all decisions are handled according to the proper chain of command and <br />oversight. Our construction management personnel have tried and tested stop -work authority <br />and will keep the City apprised as to what is going on (and why) regularly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.