Laserfiche WebLink
3 Pavement Management and Design Projects (Cities of Oakland, Chula Vista, & Coronado) <br />Reference: City of Oakland, Wladimir Wlassowsky, Project Mgr., 510-238-6383, wlassowsky@oaklandnet.com; <br />City of Chula Vista, Gregory Tscherch, Project Manager, 619-691-5021, gscherch@chulavistaca.gov; <br />City of Coronado, Jim Newton, Project Manager, 619-522-7383, jnewton@coronado.ca.us. <br />Project Duration I Contract Value: 2016-2020 1 $250k, $120k, $30k <br />Key Staff: Jason Brown, Don Bloodworth <br />City of Oakland City wide Pavement Assessment in which Kleinfelder assessed and assigned pavement <br />condition index (PCI) ratings on 11 miles of city streets. Kleinfelder then developed an subsurface investigation <br />plan in areas that had suspected base and subbase deficiencies based on pavement distresses. Kleinfelder then <br />provided pavement rehabilitation recommendations and developed PS&E documents for the pavement repairs. <br />City of Chula Vista Pavement Assessment Kleinfelder acted as a sub consultan` on an as -needed contract in <br />which we assessed, assigned PCI ratings, and provided pavement rehabilitation recommendations for over 200 <br />city street sections. <br />City of Coronado Pavement Assessment as part of an On -Call contract with the City Kleinfelder assessed and <br />assigned PCI rating for 30 street segments and updated the City's Project Management Program software <br />"StreetSaver"with the updated segment PCI ratio s. <br />1 City of • • • .•. <br />Design <br />Reference: City of Ontario, Dan Beers, Design & Construction, Principal Project Manager, 818-388-0212, <br />dbeers@ontarioca.gov <br />Project Duration I Contract Values: 2014-Ongoing 1 $2.6 Million <br />Key Staff: Deny Hanna, Jeff Waller, Eric Noel, Bryan Webb, Nick Fontaine, Christina Nishimoto, Robert Kovacs, <br />Sava Nedic, Brian Tran, Dany Hanna <br />Since 2014, Kleinfelder has been performing as -needed professional engineering design and geotechnical <br />engineering, environmental, and materials testing and inspection services as an extension to the City's engineering <br />department. The following briefly describes some of Kleinfelders key projects under this contract: <br />• D Street Storm Drain Relocation. The project consisted of undertaking the redevelopment of a parcel of land <br />located on the southwest corner of the D Street and Sultana Avenue intersection. The property, owned by the <br />City, includes an existing drain easement and 24-inch line which directs stormwater from drainage infrastructure <br />located at the intersection of Cherry Street and D Street to the existing drainage system on Sultana Avenue. <br />Given the redevelopment of the property, the goal of this project was to discontinue the existing cross-country <br />storm drain line and redirect runoff from the Cherry Street/D Street intersection to existing drainage <br />infrastructure on Sultana Avenue. <br />• C-Block Parking Structure. The Kleinfelder Team provided geotechnical and environmental engineering along <br />with special inspection, and laboratory testing services for this new four -level structure located on the northwest <br />corner of C Street and Lemon Avenue. This parking structure features 400 parking spaces, incudes roof parking, <br />has eight Tesla Motor Supercharges, and is part of the continuing redevelopment in Downtown Ontario. <br />The Kleinfelder team provided the following services: Data Gathering and Review; Preliminary Design; Site <br />Reconnaissance and Detailed Utility Verification; Public and Private Utility Coordination; Storm Drain Sizing; <br />Geotechnical Investigations; Geotechnical Laboratory Testing; Geotechnical Report; 30% Preliminary Design and <br />Report; Final Design. <br />Orange County Public Works, • .. Materials <br />DesignsTesting, Construction Inspection Services, Public Relations, and Graphic <br />Reference: County of Orange, Javier Soto, Construction/Special Projects Mgr., County of Orange, 714-227-1470, <br />'avier.soto rdmd.oc ov.com <br />Project Duration I Contract Value: 12/2017-12/2022 1 $1.5M 2- ear extension $0.5M = $2M <br />Key Staff: Deny Hanna, Eric Noel, Jeff Waller, <br />For over a decade, Kleinfelder has been providing construction inspection, geotechnical engineering, and <br />materials testing and inspection services for the County under the direction of Mr. Dany Hanna, PE, <br />Project/Contract Manager. Our services are in accordance with the County/District's Quality Assurance program <br />and support projects for the construction of new or rehabilitation of existing roadways, flood control channels, <br />parks, and/or other infrastructure. <br />1 1_ NFELOER City of Santa Ana On -Call Professional Engineering Services - No. 23-0301 Page 18 <br />BH9�IMapk. p9�, Saluivn.. <br />u <br />