Laserfiche WebLink
Task: Street Intersection, WaterMastewater Pipeline, and ADA projects <br />• Evaluate existing curb ramp conditions • Correct deficient curb ramps <br />Evaluate existing pipeline conditions <br />Sidewalk repair and/or replacement <br />Storm Drain Repair Projects <br />• Assess storm drain conditions <br />• Identify systems not meeting current standards' <br />Task: Complete Streets <br />• Evaluate and design roadway cross section <br />• Assess curbside activity, intersection <br />treatments and conflict zones <br />Task: Stormwater Projects <br />Evaluate need for Green Infrastructure (GI) <br />Assess available space to implement GI <br />Low Impact development (LID) treatment <br />design <br />Task: Bridge Deficiency <br />• Identify preventative maintenance <br />opportunities <br />• Utilize inspection reports and visual <br />assessments to evaluate critical rehabilitation <br />needs <br />FEE SCHEDULE <br />Attached as separate file, per instructions. <br />Replacement of deficient pipeline <br />systems <br />Improve Community relationships <br />Correct deficient storm drain systems <br />Ensure systems are brought to current <br />standards <br />Improve mobility and safety <br />Provide separation between motorists, <br />bikes, and pedestrians <br />More comfortable bicycling safety for the <br />public <br />Improve Community relationships <br />• Adhering to City standards, determine <br />appropriate GI <br />• Design of GI to help City meet water <br />quality goals <br />• Improve Community relationships <br />• Minimize longterm bridge maintenance <br />costs <br />• Provide clarity on the severity of <br />different issues and likely costs of <br />repair to prioritize bridge upgrades <br />LK E/NFELOER City of Santa Ana On -Call Professional Engineering Services— No. 23-0301 Page 23 <br />migrveaape. ngnt IDnrtmm <br />