My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLEINFELDER, INC. (3)
Clerk
>
Contracts / Agreements
>
K
>
KLEINFELDER, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:17:54 PM
Creation date
6/26/2023 4:07:49 PM
Metadata
Fields
Template:
Contracts
Company Name
KLEINFELDER, INC.
Contract #
A-2023-088-11
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Responding to City review comments in less than two weeks of receipt from City. <br />• Resubmittal of major design milestones within two (2) weeks of resolution of City review <br />comments. <br />• Preparing meeting minutes within two one day of conducting meeting with City. <br />• Because of our depth of expert staff resources assembled during the bidding and construction <br />phase of each task order, we can commit to the following accelerated durations: <br />• Responding to Contractor submittals and shop drawings within one week of receipt from <br />City. <br />• Responding to Contractor requests for information (RFI) within three (3) working days of <br />receipt from City. <br />Responding to Construction Contract Change Orders within two (2) working days of receipt <br />from City. <br />We understand the City may not have specific tasks designated for this contract. However, using in- <br />depth research of the CIP and RFP, we have outlined probable categories of tasks/scope the City <br />may require. The following highlights potential task and scopes of work, Kleinfelder's experience, and <br />benefits of the Kleinfelder team. <br />Experience <br />Task: Water and Sewer Pipeline Replacement <br />Kleinfelder has completed multiple pipeline <br />replacements forsimilar agencies through as - <br />needed contracts including cast iron <br />Kleinfelder has condition assessment experts, <br />and could help prioritize, and potentially <br />eliminate or delay replacement <br />Task: Raw Water Distribution <br />Kleinfelder has in-depth knowledge of the raw <br />water distribution system and completed water <br />master planning forvarious areas including <br />designing facilities and pipelines for raw water <br />distribution. <br />Benefit <br />Reduce City costs <br />• Reduce community impacts to traffic <br />• Optional solutions as part of asset <br />management <br />• Reduce coordination time with permit <br />agencies <br />• Improve reliability and efficiency <br />• Minimize customer impact for <br />implementation <br />• Provide efficient planning <br />• Familiar with the City modeling software <br />Road Reconstruction and Pavement Repair/Parking Lot <br />Assess existing pavement conditions <br />Provide pavement rehabilitation <br />recommendations and PS&E <br />• Assess parking deficiencies based on current <br />City standards <br />• Evaluate available space to determine most <br />efficient parking layout <br />Correct pavement deficiencies <br />Obtain additional parking through <br />restriping/ regrading to achieve <br />required parking spaces <br />Provide design to minimize impacts and <br />costs <br />Improve community relationships <br />I KLE//VFELOER City of Santa Ana On -Call Professional Engineering Services — No. 23-0301 Page 22 <br />B.gM1f hapk PIyMbNmnc <br />
The URL can be used to link to this page
Your browser does not support the video tag.