My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC. (4)
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:19:09 PM
Creation date
6/26/2023 4:12:12 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC.
Contract #
A-2023-088-13
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/1/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />TAIT & Associates, Inc. <br />On -Call Engineering Services <br />Organization Chart <br />The chart below summarizes our key personnel and their expertise and positions forth is contract <br />Principal -in -Charge <br />U_7` Jacob Vandervis, PE <br />Public Infrastructure & Roadways <br />David Sloan, PE, Lead Project Manager <br />Dennis Postler, Sr. Project Manager <br />Chris Engelbach, EIT, Project Engineer <br />Michael Tran, EIT, Project Engineer <br />Sub -Consultants <br />TJW, Traffic Engineering <br />BTL, Potholing <br />GMU, GeotechnicaI <br />CDPC, Landscape Architecture <br />LAE, Federal Funding <br />Salas O'Brien, MEP <br />QA/QC Manager <br />Todd Broussard, PE, CISD/P <br />Water, Wastewater & Drainage/WQ <br />Bart Mink, PE, Professional Engineer/PM <br />Samantha Wohlfarth, PE, Professional Engineer <br />Daniela Malott, PE, Professional Engineer <br />Sequoia Shire, E.I.T., Project Engineer <br />Other Technical Support <br />Surveyor <br />Michael Furlong, P.L.S. <br />Architect <br />Dan Hinson, Architect <br />Environmental <br />TAIT Environmental Services, Inc. <br />TAIT Engineering, Surveying, Architectural & Design Support Staff <br />d. Understanding of Need <br />Public Works engineering contracts require careful planning, effective communicationand precise <br />execution in order to avoid costly contract change orders or delays during the construction phase. In an <br />effort to ensure consistent and excellent services, TAIT employs our proven 5 step project management <br />protocol (Understand4Assign4 P1an4Execute�QA/QC) on each assigned contract. The scope and fee <br />for this proposal has been presented in this manner in order to show our full understanding and <br />commitment for the City's planned project. <br />STEP 1 4 UNDERSTAND: <br />Understanding the City's Needs <br />To best understand the projects specifics needs, we first focus on what the City's overall needs are for <br />this contract and future contracts that will be required as part of the On -Call Contract. Based on our <br />review of the City's RFP, the following is our understanding of the City needs on this and future projects <br />as compared to TAITs capabilities: <br />III TAIT <br />..•` Page 1 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.