Laserfiche WebLink
JS&TM will prepare construction documents (plans, specifications, and estimates) to the 60% level of completion. The <br />60% plan set will include civil, mechanical, electrical, plumbing engineering, and site engineering improvements <br />included as part of the lake renovation project. The anticipated system improvements will include, but may not be <br />limited to: <br />• Lake edge design <br />• Lake liner system design <br />• Mechanical systems (pumps, air compressors, control panels, power panels, pump vaults, etc.) <br />• Lake macro debris filters (skimmers) <br />• Aeration system (tubing, discs/pods) <br />• Fountain jet (with orwithout accent lighting) <br />• Biofiltration system(s) <br />• Aquatic vegetation (wetland planters) <br />• Aquatic vegetation planting palette <br />• Artificial reefs <br />• Fish spawning area <br />• Vector control enhancements (bat boxes) <br />• Waterfowl control enhancements (owl boxes and signage) <br />• Site Improvements (landscape/erosion control, walkways, seating areas, fishing dock/pier) <br />Deliverable: 60% set of plans, draft of lake specification and city boiler plate specifications, construction cost <br />estimates <br />Task 8: Construction Documents (90% and 100% Plans, Specifications & Engineer's Estimate) <br />JS&TM will prepare a complete plan set for construction documents for two submittal intervals at the 90% level of <br />completeness and a final set that is 100% complete. The construction documents will include lake renovation plans, <br />specifications and estimates for Carl Thornton Park Lake. The construction plans will include the information <br />necessary for the successful construction of the lake including plan view layouts, section view drawings, construction <br />detail drawings, equipment and material specifications, as well as general notation and construction notes needed for <br />the contractor to construct the proposed facilities. The specifications package will include a complete lake <br />construction specification for the overall lake and all the proposed lake systems including mechanical, electrical, <br />plumbing, aquatic vegetation, fish stocking, fish habitat, waterfowl control measures, and vector control measures. A <br />comprehensive bid list will be prepared to support the bidding process. The 100% plans and specifications will be <br />stamped by a licensed California professional engineer. Construction drawings shall be in accordance with the 2022 <br />California Building Code. <br />JS&TM will prepare detailed construction cost estimate of the proposed lake improvements including construction <br />quantities and unit costs. The quantities will be developed based upon construction item callouts from the Lake Plans <br />and Specifications package. Unit costs will be based upon recent project cost information for similar projects in <br />Southern California. The Construction Cost Estimate will be provided to the client to use as the Engineers Estimate <br />for bidding. Construction Documents (CDs) shall include finalizing plans and specifications from the Design <br />Development phase. This includes the provision of detailed engineering and construction drawings that will serve as <br />the basis for both bidding and construction by a general contractor. <br />1S&TM will prepare technical specifications for all components listed above in CSI (Construction Specifications <br />Institute) format. JS&TM will coordinate language between the general and technical specifications to ensure conflicts <br />Thornton Park Lake Circulation Study and Renovations Page 12 <br />