Laserfiche WebLink
are minimized. City Staff will combine these specifications with the City Boiler Plate which together, will become the <br />Project Manual <br />JS&TM will provide plan processing services to obtain the necessary approvals, signatures, and permits to allow the <br />project to move forward to construction. We understand that the project PS&E package may need to be revised to <br />accommodate project phasing as may be required to accommodate project funding limitations. JS&TM will prepare <br />phased implementation plans, if needed to accommodate project phasing needs. It is anticipated that the PS&E <br />package will be reviewed by multiple COSA departments and other agencies including Public Works Design, Water and <br />Construction Engineering Divisions, City Planning and Building Agency, and Parks Recreation & Community Services <br />Division, California Department of Fish and Game, the California State Department of Agriculture, Vector Control, and <br />the California Regional Water Quality Control Board. <br />Deliverable: Complete Lake Construction documents package including Plans, Specifications and Estimates (PS&Es) <br />at 90% and 100% levels of completion. <br />Task 9: Bid Advertisement, Construction Administration, Record Drawings: <br />Bid Advertisement <br />JS&TM will provide support to the City during the Bidding phase by assisting with questions, requests for <br />information/clarification, reviewing addenda or conflicts arising out of the bidding process within three (3) working <br />days. Consultant shall also attend pre -bid meeting, if scheduled. <br />Construction Administration <br />JS&TM will provide support to the City during the Construction Administration phase by assisting with questions, <br />requests for information/clarification, and/or reviewing submittals. <br />Record Drawings / As -built Plans: <br />Upon construction completion, JS&TM will incorporate as -built information, as provided by the General Contractor, <br />into the drawing files to provide record drawings for City archives. <br />Deliverable: Bid Documents, RFI Response, Construction submittal review and response, As -Built Plan set <br />Task 10: Meetings, Consultation, and Coordination <br />JS&TM will provide coordination, communication, and technical consultation with City staff and other project team <br />consultants throughout the duration of the project. This includes meetings/phone discussion/online conferences at <br />regular intervals to discuss the progress of the study and consultation to assist the project planning. <br />Deliverable: Meeting minutes, project guidance, project management <br />Thornton Park Lake Circulation Study and Renovations Page 13 <br />