Laserfiche WebLink
Project Name: <br />Date of Services: <br />Contract Value: <br />Client Reference: <br />Rockport Ranch Lake <br />2022-Current <br />$40,000 <br />Dudek <br />Nicole Rieger <br />Project Manager <br />760.419.4648 <br />LENNAR' <br />nrieger@dudek.com <br />Key Staff: Jonis Smith, PE; Tim Mull, PE <br />Description of Project: Mr. Smith served as project QC manager and lead project engineer for the Rockport Lake <br />Design Project. Mr. Smith provided design and engineering oversight and guidance services to Dudek engineering staff <br />to develop this new community lake. Mr. Smith guided the design team develop a sustainable lake that can be managed <br />with naturalized management techniques without the use of chemical inputs. Led by Mr. Smith, the design team <br />designed a lake biofiltration, wetland aquatic vegetation system, lake aeration and vertical mixing system, lake <br />horizontal circulation system, and macro trash removal filters. <br />Mr. Smith and Tim Mull are currently providing bid support and construction support service to Lennar for the <br />construction of the proposed lake. <br />j J 1 <br />... . ......L g <br />Thornton Park Lake Circulation Study and Renovations Page 15 <br />