My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Project W-Bus Shelter
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Item 19 - Project W-Bus Shelter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 11:38:53 AM
Creation date
7/12/2023 12:15:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
7/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract with M.S. Construction Management Group <br />July 18, 2023 <br />Page 2 <br />DISCUSSION <br />The City has identified the need to undertake the installation of new bus shelters <br />throughout all Santa Ana Neighborhoods (Exhibit 1). The scope of work includes <br />excavation, grading, removal, and replacement of Portland cement concrete, and <br />installation of new bus shelters. After completion, the newly installed bus shelters will <br />provide protection from various weather conditions for citizens as they wait for the bus <br />at any bus stop location throughout Santa Ana. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of 900 <br />regional vendors via PlanetBids, many of which are Santa Ana based. Five vendors <br />requested bidding documents and a total of two bids were received. Bids were not <br />received from any Santa Ana contractors. As legally required, a Notice Inviting Bids was <br />advertised in the Orange County Register newspaper on April 21, 2023 and April 28, <br />2023. The project was also advertised in PlanetBids from April 21, 2023 through May <br />107 2023. Bids were received electronically via PlanetBids on May 10, 2023. <br />Bid Results Summary <br />Rank <br />Bidder's Name <br />Location <br />Base Bid <br />1 <br />M.S. Construction Management Group <br />Dana Point, CA <br />$428,420 <br />2 <br />ND Construction Co., Inc. <br />Long Beach, CA <br />$523, 183 <br />A total of two bids were received, and both were deemed responsive. M.S. <br />Construction Management Group submitted the lowest responsive base bid in the <br />amount of $428,420 (Exhibit 2). As specified in the bid documents, the lowest bid shall <br />be determined on the basis of the Base Bid. Based on the bid analysis and a <br />contractor's reference check, staff recommends awarding the construction contract to <br />M.S. Construction Management Group, in the amount of the base bid totaling $428,420 <br />(Exhibit 3). <br />M.S. Construction Management Group has not performed as a prime contractor in the <br />City of Santa Ana within the past five years. A reference check was made and good <br />reviews were from other public agencies regarding the quality of work performed by <br />M.S. Construction Management Group. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract bid amount, the <br />estimated total project delivery cost includes construction administration, inspection, <br />and testing, as well as an allowance for contingencies to account for unexpected or <br />unforeseen conditions. Construction administration and inspection includes construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.