Laserfiche WebLink
CNYliWOI i_1 NE _ ► ; <br />The Contractor shall be liable for any damage caused by installation or removal of building <br />protections. <br />14. When new vinyl flooring systems and/or carpet have been installed, the Contractor shall ensure <br />that the floor protection is in place prior to placing any move carts, dollies, etc. onto the newly <br />finished surfaces. Protection shall ensure that no dents or streaks occur on the new floor finish at <br />the completion of the relocation (moving) services. <br />B. NEWHOPE LIBRARY PROJECT SCOPE: <br />1. Circulating and Non -circulating General Collections: Contractor shall move and store the <br />Library's circulating and non -circulating collections, including, but not limited to, approximately <br />40,000 volumes of children, adult, and oversized books and audiovisual materials such as DVDs <br />and CDs. <br />2. Shelving and Furniture: Approximately 5% of existing shelving will be included in the project scope. <br />All furniture items shall be included and must be moved and stored by Contractor. This includes <br />public -area seating, tables and chairs. The City will ensure that furniture pieces are disconnected <br />from electrical sources. <br />3. Technology: Larger -sized equipment, including printers, a self -check station, security gates, and a <br />laptop dispensing kiosk, shall be included in the project scope. Some desktop computers and other <br />smaller pieces may also be included. <br />4. Packing: Packing of the Library's circulating and non -circulating collections and materials will be <br />done by City staff, but Contractor must provide all boxes. Contractor must also ensure that boxes <br />containing the collections are kept and stored in the sequence provided by staff to allow for items to <br />be reshelved in a timely manner. <br />5. Schedule: <br />Deliver Packing <br />Materials <br />Library Closure <br />Relocation to <br />Stora a <br />Storage Duration <br />Relocation to <br />Library <br />October 2023 <br />1 November 2023 <br />1 November 2023 <br />Nov. 2024-June 2024 <br />June 2024 <br />Note: Dates are tentative and are subject to change based on construction timeframes. <br />C. MAIN LIBRARY PROJECT SCOPE: <br />1. Circulating and Non -circulating General Collections: Contractor shall move and store the <br />Library's circulating and non -circulating collections, including, but not limited to, approximately <br />100,000 volumes consisting of children, adult, and oversized books and audiovisual materials such <br />as DVDs and CDs. <br />2. Local History Room: Approximately 700 archival boxes with collections and other ephemeral items, <br />6,400 microfilm reels, contents of five (5) filing cabinets, seven (7) carts containing oversized books, <br />three (3) carts containing oversized maps, 44 oversized exhibit portraits and 11 oversized photo <br />frames shall be moved and stored by Contractor. <br />RFP No. 23-058 Library Moving and Storage Services Page 18 of 40 <br />