My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Santa Ana Zoo Educational Hub Building Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 15 - Santa Ana Zoo Educational Hub Building Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:04:43 PM
Creation date
8/9/2023 3:28:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ea <br />Consultant Responsibilities: <br />The Consultant's responsibilities include the following, and shall consist of the following project <br />tasks: <br />Consultant is responsible for providing all design and engineering as required for all components <br />within the project scope of work. This includes but is not limited to survey, civil engineering, <br />geotechnical investigation, architectural/landscape architectural design, structural engineering, and <br />electrical engineering. Project team should also include a CASP certified professional to ensure <br />accessibility of all public areas. <br />Consultant shall provide review sets in ,pdf format. <br />Task l: Pre Design <br />Preliminary design shall include Kick-off meeting with City Staff (representatives from Public Works <br />Agency, Parks, Recreation and Community Services Agency and Santa Ana Zoo) to discuss scope of <br />work, project goals and objectives, potential elements and issues, schedule, review of existing <br />information and site investigation. <br />➢ Deliverables shall include a Work Task Plan, Schedule, Geotechnical Report and Site Survey. <br />Task 2: Concept Design <br />Concept design shall include up to three (3) meetings with City Staff to brainstorm and review <br />potential layouts. <br />➢ Deliverables shall include up to three (3) schematic concept designs, with one final rendered <br />concept site plan and perspective drawing for fundraising and presentation purposes. <br />City of Santa Ana RFP 23-033 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.