My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Santa Ana Zoo Educational Hub Building Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 15 - Santa Ana Zoo Educational Hub Building Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:04:43 PM
Creation date
8/9/2023 3:28:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3: Design Development (50% plans) <br />Design development will involve the schematic development of approved concept plan, which shall <br />include landscape architectural, architectural, civil engineering, structural, electrical engineering, <br />draft technical specifications and "opinion of estimated cost'. <br />➢ Deliverables shall include a 50% set of plans, including site section studies, draft specification, <br />"Opinion of Probable Cost". <br />Task 4: Construction Documents (90% and 100% plans) <br />Constriction Documents (CDs) shall include finalizing approved deliverables from the Design <br />Development phase. This includes the provision of detailed engineering and construction drawings <br />that will serve as the basis for both bidding and construction by a general contractor. <br />➢ Deliverables shall include 90% and 100% plans, structural calculations, CASP report, final <br />technical specifications, finalized "Opinion of Probable Cost". <br />Plans: Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />a Site Erosion Plan <br />o Horizontal and Vertical Control Plan <br />o Grading and On -Site Drainage Plan <br />o Site Utility Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans and Details (including plumbing) <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />• .Architectural <br />o Holding Facility Plans <br />o Holding Facility Interior elevations, Finish schedule <br />o Roof Framing Plan <br />o Reflected Ceiling Plan <br />o Exterior Elevations <br />o Interior Elevations <br />o Mechanical and Plumbing Plans/T-24 <br />a Electrical Plans, as applicable <br />o Architectural Details <br />o Structural Calculations <br />o Door/Window/Finish Schedules, as applicable <br />Structural Engineering <br />City of Santa Ana RFP 23-033 <br />Page Al-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.