Laserfiche WebLink
<br />Page | A-1 <br /> <br />MCFADDEN AVENUE PROTECTED BIKE LANE AND <br />BICYCLE BOULEVARD PROJECT <br />CITY OF SANTA ANA <br />ATTACHMENT A: RESUMES <br /> MICHAEL GREER, PE, TE <br />PROJECT MANAGER <br />EDUCATION Mr. Greer manages the design of roadways and complete streets in accordance with City, County, Caltrans, and AASHTO standards. He also works on traffic signals, lighting design, and electrical infrastructure giving him the unique ability to foresee various potential issues related to design. He has also worked in the field as a roadway inspector, allowing him the opportunity to gain valuable knowledge about construction equipment, practices, and techniques. <br />EXPERIENCE San Pablo Avenue Streetscape Phases I & II, Palm Desert, CA │ Project Engineer responsible for the design and preparation of plans for the roadway (including pedestrian, bicycle, and roundabout), traffic electrical (including lighting and signal modifications), and traffic control (including signing and striping) improvement portions of this road-diet project. A Roundabout Validation Report, City Council Study Session on Roundabouts, and Position Paper on the Use of Roundabouts versus Stop Control at Intersections were specifically prepared. Mike was essential in leading utility and stakeholder communication and coordination. <br />Paseo Santa Fe Streetscape Phases II & III, Vista, CA │ Project Engineer for the PS&E of the South Santa Fe Streetscape Improvements, Phases II and III. Design improvements include roundabouts, utility undergrounding, enhanced landscaping and hardscaping, pedestrian oriented streetscape furnishings, and water quality design features that qualify this roadway as a Green Street. <br />Traffic Striping and Signing Plans Associated with County of San Diego Road Maintenance Projects, San Diego County, CA │ Project Engineer responsible for the traffic striping and signing plans to support and assist the Department of Public Works County of San Diego Road Maintenance Projects for the past three fiscal years (FY 17/18, FY 18/19, and FY 19/20). In total, over the last three years we have prepared traffic striping and signing plans for nearly 57 miles of roadway, adding approximately 20 miles of Class II bike lanes and 15 miles of Class III bike routes to County roads during the contracted fiscal years. <br />Highway 101 NB (4th St) ADA / Safety Improvements, Eureka, CA Project Manager responsible for the PS&E preparation and successful delivery of this downtown mobility project to enhance pedestrian, bicycle, and driver safety. Nearly 100 curb ramp and 100 driveway upgrades were provided to ensure ADA compliance along with 20 new bulb-outs to reduce pedestrian exposure within crosswalks. Modifications to six traffic signals were provided as well as one new traffic signal and improvements to storm drain inlets as needed. <br />Highway 101 NB & SB (L St & M St) ADA / Safety Improvements, Crescent City, CA │ Project Manager responsible for PS&E preparation and successful delivery of this two-mile long safety and mobility enhancement project that upgraded 85 curb ramps and added 10 new ones, including a mid-block crossing with pedestrian actuated RRFB’s. Over 100 driveways were also upgraded for ADA compliance with conforms and utility impacts minimized throughout design. <br />2008, BS Civil Engineering <br />San Diego State University <br /> <br />REGISTRATION <br />California Professional <br />Civil Engineer, #79080 <br /> <br />California Professional <br />Traffic Engineer, <br />#2845 <br /> <br />EXPERIENCE <br />12 Years (with Dokken <br />since 2008) <br /> <br />AFFILIATIONS <br />American Society of Civil <br />Engineers (ASCE) <br /> <br />Institute of Transportation <br />Engineers (ITE) <br /> <br />AREAS OF EXPERTISE <br /> Project Management <br /> Roadway/ADA Design <br /> Pavement <br />Management <br /> Utility/ROW <br />Coordination <br /> Traffic Signals & <br />Lighting <br /> Ramp Metering <br />Systems <br /> Transit Station <br />Amenities <br /> Roundabout Design <br /> Green Streets <br /> Traffic Monitoring/ <br />Count Stations <br /> Interconnection and <br />Fiber Optic Networks <br />City Council 16 –49 6/1/2021