My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:45:01 PM
Creation date
8/10/2023 8:24:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Signal <br />Local Si l Synchronization Plan <br />g Y <br />CSPI �. <br />" S 80 Very good progression — traveling through signalized intersections Tier i <br />with minimal stops and favorable travel speeds. <br />070-80 I Good progression —traveling through signalized intersections with Tier 2 <br />few stops and good travel speeds. <br />60-70 Fair progression — traveling through signalized intersections with Tier 3 <br />moderate stops and fair travel speeds. <br />050-60 Limited progression* — traveling through signalized intersections Tier 4 <br />with moderately high stops and slower travel speeds. <br />< 50 Very limited progression* —traveling through signalized Tier 5 <br />intersections with frequent stops and slow travel speeds. <br />Figure 6 - CSPI Score and Description <br />Over the past three years from 2020 to 2023, the City, in cooperation with OCTA and other local <br />agencies, participated in synchronizing a number of important corridors in the City and adjacent <br />jurisdictions. Many corridors have been previously synchronized and maintained, however due <br />to changes in traffic conditions and patterns, periodically complete re -time is necessary and can <br />result in significant improvement in travel time and reduction in delays. <br />The following corridors were synchronized or currently in the process of implementation: <br />• Fairview St, Bear St, and Garden Grove/Memory Ln Corridors synchronization were <br />completed in 2022. <br />• Main St Corridor synchronization was completed in 2021 and is currently in the <br />monitoring stage for 2 years. <br />• Warner Ave Corridor synchronization is ongoing and expected to be completed by <br />winter 2023. <br />• Edinger Ave Corridor synchronization is ongoing and expected to be completed by <br />Winter 2023. <br />Page 31 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.