Laserfiche WebLink
City of Santa Ana <br />Local Signal Synchronization Plan <br />• MacArthur Blvd Corridor synchronization is ongoing and expected to be completed <br />by winter 2023. <br />• Segerstrom Ave/ Dyer Rd Corridor synchronization is ongoing and expected to be <br />completed by early 2024. <br />• Tustin Ave / Rose Dr Corridor synchronization is ongoing and expected to be <br />completed by winter 2023. <br />• 15tSt / Bolsa Ave Corridor synchronization is ongoing and expected to be completed <br />in winter 2023. <br />A. Performance Results: <br />The main objective of improving traffic flow along the entire corridor was met on every one of <br />these corridors, even on corridors that are currently synchronized. The improvements are <br />evident in every category of travel time reduction, stop reduction, increased green to red signal <br />ratio and overall corridor performance improvements. <br />A summary of the corridor improvements from local traffic signal synchronization projects is <br />shown on Table 6 (Traffic Signal Synchronization Assessment, Review & Revision). The <br />assessment breaks down the results for each corridor by direction and time of day to provide a <br />detailed analysis of the corridors performance. A graphical representation of corridor <br />performance Citywide is shown in Figure 7 (Santa Ana 2023 Corridor Synchronization <br />Performance Map). The map shows overall CSPI results derived from OCTA's 2021 Corridor <br />Performance Report. <br />Page 32 2023 <br />