My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:45:01 PM
Creation date
8/10/2023 8:24:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Local Signal Synchronization Plan <br />• MacArthur Blvd Corridor synchronization is ongoing and expected to be completed <br />by winter 2023. <br />• Segerstrom Ave/ Dyer Rd Corridor synchronization is ongoing and expected to be <br />completed by early 2024. <br />• Tustin Ave / Rose Dr Corridor synchronization is ongoing and expected to be <br />completed by winter 2023. <br />• 15tSt / Bolsa Ave Corridor synchronization is ongoing and expected to be completed <br />in winter 2023. <br />A. Performance Results: <br />The main objective of improving traffic flow along the entire corridor was met on every one of <br />these corridors, even on corridors that are currently synchronized. The improvements are <br />evident in every category of travel time reduction, stop reduction, increased green to red signal <br />ratio and overall corridor performance improvements. <br />A summary of the corridor improvements from local traffic signal synchronization projects is <br />shown on Table 6 (Traffic Signal Synchronization Assessment, Review & Revision). The <br />assessment breaks down the results for each corridor by direction and time of day to provide a <br />detailed analysis of the corridors performance. A graphical representation of corridor <br />performance Citywide is shown in Figure 7 (Santa Ana 2023 Corridor Synchronization <br />Performance Map). The map shows overall CSPI results derived from OCTA's 2021 Corridor <br />Performance Report. <br />Page 32 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.