My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:45:01 PM
Creation date
8/10/2023 8:24:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Local Signal Synchronization Plan <br />C. System Improvements: <br />In addition to the corridor synchronization, improvements to the traffic signal system, <br />communication and monitoring infrastructure were made to allow the City to better monitor <br />traffic condition, manage traffic signals and maintain the synchronization. <br />1. Fairview St Corridor: The project is complete. The upgrades included all controllers to ATC, <br />Upgrade traffic signal communication to IP addressing, install conduit with fiber optic cable <br />and wireless communication links, install/upgrade CCTV camera at 5 locations, install <br />system detection at Harvard St, and replace traffic signal cabinets at 7 locations. <br />2. Bear St Corridor: The project is complete. The upgrades included all controllers to ATC, <br />upgrade traffic signal communication to IP addressing, install/upgrade CCTV camera at <br />MacArthur Blvd and Segerstrom Ave, install UPS system and video detection at Alton Ave, <br />and replace traffic signal cabinet at MacArthur Blvd. <br />3. Garden Grove / Memory Corridor: The project is complete. The upgrades included Video <br />detection systems at Bristol St. <br />4. Main St Corridor: The project is complete. The upgrades included Advance Traffic <br />Management System at TMC and all controllers to ATC; installed conduit with fiber optic <br />cable; installed/upgraded CCTV cameras at 8 locations; installed system detection at <br />MacArthur Blvd; replaced traffic signal cabinets at 6 locations; and installed Bluetooth travel <br />time system at 2 locations. Provided additional video management system licenses. <br />5. Tustin Ave / Rose Dr Corridor: This project will soon be in construction. The upgrades <br />include replace existing controllers to ATC; install fiber optic cable; install ethernet switch <br />and install CCTV camera at Santa Clara Ave; and replace traffic signal cabinet at 2 locations. <br />6. Edinger Ave Corridor: This project will soon be in construction. The upgrades include all <br />controllers to ATC, install/upgrade CCTV cameras and video detection cameras, install <br />conduit and fiber optic cable, Ethernet switches, ATMS License expansion and Signal <br />Performance Measures. <br />Page 36 ' 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.