My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 28 - Measure M2 Funding Eligibility Renewal 2023-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:45:01 PM
Creation date
8/10/2023 8:24:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Local Signal Synchronization Plan <br />7. Warner Ave Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, Bluetooth travel systems, replace <br />traffic signal cabinet at 2 locations, ATMS License expansion and Signal Performance <br />Measures. <br />8. MacArthur Blvd Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, Bluetooth travel systems, replace <br />traffic signal cabinet at 3 locations, ATMS License expansion and Signal Performance <br />Measures. <br />9. Segerstrom/Dyer Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, and Signal Performance Measures. <br />10. 1StSt / Bolsa Ave Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and VDS, install APS systems, <br />install conduit and fiber optic cable, Ethernet switches, replace traffic signal cabinet with <br />ATCC cabinets at 5 locations, and Signal Performance Measures. <br />11. Euclid St Corridor: This project will begin design. The upgrades include upgrade all <br />controllers to ATC, install/upgrade CCTV cameras and VDS, install APS systems, install EVP, <br />Ethernet switches, Signal Performance Measures and TMC hardware upgrades. <br />Page 37 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.