Laserfiche WebLink
City of Santa Ana <br />Local Signal Synchronization Plan <br />7. Warner Ave Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, Bluetooth travel systems, replace <br />traffic signal cabinet at 2 locations, ATMS License expansion and Signal Performance <br />Measures. <br />8. MacArthur Blvd Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, Bluetooth travel systems, replace <br />traffic signal cabinet at 3 locations, ATMS License expansion and Signal Performance <br />Measures. <br />9. Segerstrom/Dyer Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, and Signal Performance Measures. <br />10. 1StSt / Bolsa Ave Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and VDS, install APS systems, <br />install conduit and fiber optic cable, Ethernet switches, replace traffic signal cabinet with <br />ATCC cabinets at 5 locations, and Signal Performance Measures. <br />11. Euclid St Corridor: This project will begin design. The upgrades include upgrade all <br />controllers to ATC, install/upgrade CCTV cameras and VDS, install APS systems, install EVP, <br />Ethernet switches, Signal Performance Measures and TMC hardware upgrades. <br />Page 37 2023 <br />