My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Main Street Rehabilitation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 15 - Main Street Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:30:20 PM
Creation date
8/10/2023 8:45:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Street Rehabilitation Project <br />June 20, 2023 <br />Page 3 <br />staff recommends awarding the construction contract to All American Asphalt, in the <br />amount of the base bid totaling $2,014,055 (Exhibit 3). <br />All American Asphalt has worked on various projects for the City of Santa Ana <br />throughout the last several years. The most recent project is Local Street Preventative <br />Maintenance FY 2021-22. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes construction <br />management, inspection of the contractor's work to ensure contract compliance, <br />workmanship, quality, and materials testing. As indicated in the Cost Analysis (Exhibit 4) <br />and as summarized in the table below, the estimated total construction delivery cost of <br />the project is $2,417,000. <br />Project Item <br />Total <br />Construction Contract <br />$2,014,055 <br />Construction Administration, Inspection, Testing <br />$201,406 <br />Contingencies <br />$201,539 <br />Total Construction Delivery Cost <br />$2,417,000 <br />In order to account for the widespread price increases in construction material, Staff <br />recommends reallocating $250,000 from Miscellaneous Stormdrain Repairs <br />Improvements FY 2022-23 (No. 23-6458) and $361,000 in unspent Road Maintenance <br />and Rehabilitation Account (SB-1) funds from Euclid Rehabilitation, South City Limit to <br />McFadden, Project (No. 20-6961). <br />Approval of this item will amend the FY 2022-23 Capital Improvement Program to <br />include the Main Street Rehabilitation from Macarthur Boulevard to Dyer Road and St. <br />Gertrude Place at Orange Avenue Project (Exhibit 5). <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2023-57 was filed for the project. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the total construction delivery cost of the project is <br />$2,417,000 which includes construction, contract administration, inspection, testing, and <br />an authorized contingency. During construction, if necessary, funds may be reallocated <br />between Construction Administration, Inspection, Testing and/or <br />Contingencies. Contingency may be increased to a maximum limit of 25% of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.