My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Rousselle Street and Warner Avenue Flood Protection Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 28 - Rousselle Street and Warner Avenue Flood Protection Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:39:22 AM
Creation date
8/10/2023 9:39:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(;+,%,7ꢀꢁ <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE: <br />Rousselle Street Flood Protection <br />Project <br />PROJECT DESCRIPTION:PROJECT NEED: <br />Design and construction of the Rousselle Street Flood Protection <br />Project. This project features the upgrade of existing City stormdrain <br />on Rousselle Street, from Warner Avenue to St Gertrude Place, and <br />was identified in the City’s 2018 Storm Drain Master Plan as one of <br />the top 10 recommended capital projects. <br />The City experiences significant flooding during intense rain events, <br />which has negative impacts on vehicles and pedestrian travel, <br />business operations, and causes property damage. The project will <br />increase the capacity of the City’s stormdrain system to reduce flooding <br />and also includes stormwater treatment devices.PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Storm Drain/Water Quality <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 22/23 <br />4,280,000 <br />365,000 <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Engineering <br />Planning 30,000 <br />TOTAL 4,675,000 <br />SOURCE OF FUNDS FY 22/23 <br />4,675,000 <br />4,675,000 <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />DWR Prop 68 FMPRA ------ <br />TOTAL ------ <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Craig Foster, NPDES Manager 06-June-2023
The URL can be used to link to this page
Your browser does not support the video tag.