My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Rousselle Street and Warner Avenue Flood Protection Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 28 - Rousselle Street and Warner Avenue Flood Protection Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:39:22 AM
Creation date
8/10/2023 9:39:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(;+,%,7ꢀꢁ <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Warner Ave Flood Protection Project This project features the upgrade of existing City stormdrain on <br />Warner Avenue, from Oak Street to Standard Avenue. Construction <br />of the new stormdrain will be completed as part of the Warner <br />Avenue Phase II Improvements Project. Project will increase the <br />capacity of the City's stormdrain to reduce flooding and include <br />stormwater treatment devices. <br />The City experiences significant flooding during intense rain events, <br />which can have negative impacts on vehicle and pedestrian travel, <br />business operations, and can cause property damage. The City’s 2018 <br />Storm Drain Master Plan recommended numerous stormdrain system <br />improvements citywide in order to facilitate storm flows and reduce <br />flooding. <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Storm Drain/Water Quality <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 22/23 <br />1,000,000 <br />50,000 <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Engineering <br />Planning 30,000 <br />TOTAL 1,080,000 <br />SOURCE OF FUNDS FY 22/23 <br />1,080,000 <br />1,080,000 <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />DWR Prop 68 FMPRA ------ <br />TOTAL ------ <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering David Ramirez, Associate Engineer 06-June-2023
The URL can be used to link to this page
Your browser does not support the video tag.