My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:55 PM
Creation date
8/10/2023 9:41:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
35
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii. Drought Tolerant with low voltage spot lighting <br />f. North Entrance <br />i. New doors to match original design (or propose new architecturally appropriate <br />design) <br />ii. Clean up entrance building lettering & stone <br />iii. Replace walkway connecting north entrance to sidewalk on Civic Center Dr. <br />iv. Restore dedication plaque on north entrance sidewalk. <br />g. East Entrance <br />i. Make secondary public entrance at current staff access to fenced patio <br />ii. Create parking area along east or south side of building for library exclusively <br />iii. Keep as many trees as feasible <br />iv. Create a drive-thru window considering circulation on/off of Ross St. <br />1. If feasible, ensure it does not detract from historic nature of the building <br />h. South Entrance <br />i. Return to a bookmobile area with garage/carport and the back of house loading <br />area <br />ii. Patio area just east of south entrance <br />1. Remove panels/walls that block the patio adjacent to entrance that create <br />a hiding space in this area <br />2. Activate this area <br />iii. Remove book drop — replace with new book drops at north and east entrances <br />iv. Blend proposed landscaping with new landscaping to south <br />i. Children's Library — single story addition on the west side of the Main Library building <br />i. Provide vines or other low maintenance plant material on east side of building to <br />prevent graffiti <br />ii. Patio renovation completed under separate contract <br />j. Provide comprehensive exterior security cameras and necessary low voltage cabling <br />k. Coordinate with IT to provide no low voltage cat 6 cabling/trays throughout the building <br />along with new access points <br />1. A new roof was recently completed <br />2. Interior <br />a. General building <br />i. Consider elevator relocation with modern elevator <br />ii. Review/consider replacing all building systems <br />iii. Include technology in all meeting rooms <br />iv. Replace all flooring throughout <br />v. Upgrade all restrooms. May need to adjust access or location of restrooms to <br />accommodate new layout that is more in line with original plans. They were <br />modified and relocated in 1990. <br />vi. Shelving needs assessment/shelving program — Replace all book stacks <br />vii. New lighting plan to ensure new improvements do not create shadows and dark <br />areas <br />viii. Replace all furniture in public and private spaces <br />ix. Ceiling system was recently upgraded. Modifications may be required <br />depending on results of shelving analysis. <br />x. Replace Exterior windows in Main Library building and Children's Library <br />addition <br />xi. ADA compliance/Accessible path of travel <br />b. Main Floor <br />i. Refinish wood/metal elements <br />ii. South side back of house <br />City of Santa Ana RFP 22-173A <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.