My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:55 PM
Creation date
8/10/2023 9:41:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
35
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . STATEMENT OF QUALIFICATIONS <br />GRIFFIN STRUCTURES 1 18 <br />Communication Protocol <br />Building on the project objectives identified <br />in the initial assessment, we will then begin <br />establishing standardized communication <br />protocols. These protocols are critical in a <br />project of this size and scope. Accordingly, <br />Griffin will establish a clear line of <br />communication between the team members <br />which can later be utilized during the <br />construction process. Working closely with the <br />City, Griffin will identify proper communication <br />channels between the field (Contractors and <br />Inspectors) and support team (Design Team, <br />Multi -Disciplinary Engineers, and City) to <br />ensure seamless communication throughout <br />the duration of the project. <br />Document Management <br />Griffin Structures employs the use of Submittal <br />Exchange for all project document controls. <br />This system is comprehensive, adaptable, <br />straightforward, and easy to use. By utilizing <br />this cloud -based format, Griffin Structures <br />can establish a single document portal that <br />saves and manages all project documents. <br />Utilizing this cloud -based system as a single <br />source of document control provides clear <br />and consistent communication to the <br />field, ensures comprehensive document <br />coordination, protects against claims, <br />accelerates the construction schedule by <br />streamlining communications, and ultimately <br />saves the entire project significant costs <br />by eliminating printing and shipping, and <br />improves efficiency. <br />Schedule Management <br />As with communication and document <br />control, schedule management and efficient <br />construction production relies on multiple <br />factors, for which Griffin has an established <br />protocol. Griffin will begin by producing a <br />comprehensive master project schedule. This <br />schedule will include all aspects of the project <br />including, but not limited to: <br />Design iterations <br />Design review times <br />Permitting phases <br />Contractor prequal <br />Bidding <br />Contracts & insurance <br />Construction phases <br />Utility connections <br />City IT installations <br />Punch List <br />Commissioning <br />Contingency <br />GRIFFIN <br />STRUCTURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.