My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:55 PM
Creation date
8/10/2023 9:41:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
35
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Cost of bulk blueprinting for plans and specifications for use by the contractors and subcontractors <br />is excluded. Funds included in reimbursable expenses are for Griffin printing costs alone. <br />9. Independent or third -party testing companies such as Roofing, Peer Reviews, LEED, or other <br />specialized third -party oversight services other than those listed herein are excluded. <br />10. No FF&E or OS&E procurement is included in this proposal. <br />11. Construction Site Security is excluded. <br />12. Construction Manager will track and review all RFI's, Submittals, and Substitutions only for <br />completeness. Approvals shall be executed by the designer of record. <br />13. Construction Cost Estimates, when provided, are based on standard industry practice, professional <br />experience, and knowledge of market conditions. Griffin has no control over material and labor <br />costs, contractor's methods of establishing prices or the market and bidding conditions at the time <br />of bid. Therefore, Griffin does not guarantee that bids received will not vary from the cost estimate <br />provided and Griffin is not liable for any costs, liabilities, or damages incurred by the Agency <br />arising from Griffin's opinion of cost, the actual project cost to the Agency, delays caused by events <br />outside the control of Griffin, or any labor or material cost increases. <br />14. Griffin is not responsible for, and the City will hold Griffin harmless from, any schedule delays <br />and/or any losses, damages, or liabilities resulting therefrom that are caused by (1) events or <br />conditions that are outside of Griffin's control or (2) the acts or omissions of parties for whom <br />Griffin is not legally liable (collectively, "Non -Consultant Delays ). The schedule for completion <br />will be extended for any Non -Consultant Delays. If Griffin incurs additional costs or expenses due <br />to Non -Consultant Delays, then Griffin's fee compensation will be equitably adjusted to cover such <br />additional costs or expenses. <br />15. Dry utility design consultation services are not included. <br />16. This proposal shall remain valid and in full force and effect for a period of 120 days from date of <br />issuance, after which time it shall be deemed null and void. <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.