My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Riverview Neighborhood Street Lighting Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 18 - Riverview Neighborhood Street Lighting Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:38:28 PM
Creation date
8/10/2023 11:19:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverview Neighborhood Street Lighting Project <br />May 16, 2023 <br />Page 3 <br />determined on the basis of the Base Bid. Based on the bid analysis and a contractor's <br />reference check, staff recommends awarding the construction contract to California <br />Professional Engineering, Inc. in the amount of the base bid totaling $358,210 (Exhibit <br />3). <br />California Professional Engineering, Inc. has successfully completed various projects for <br />the City of Santa Ana throughout the last several years. The most recent projects are <br />Pacific Electric Bike Trial, Sandpointe Paseo Lighting, and Thornton Park Lighting. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes the following: <br />construction management; inspection of the Contractor's work to ensure contract <br />compliance, workmanship, and quality; and materials testing. As indicated in the Cost <br />Analysis (Exhibit 4) and as summarized in the table below, the estimated total <br />construction delivery cost of the project is $483,584. <br />Project Item <br />Total <br />Construction Contract <br />$358,210 <br />Construction Administration, Inspection, Testing <br />$53,732 <br />Contingencies <br />$71,642 <br />TOTAL CONSTRUCTION DELIVERY COST <br />$483,584 <br />Approval of this item will amend the FY 2022-23 Capital Improvement Program to <br />include the Riverview Neighborhood Street Lighting Project (Exhibit 5). <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2023-181475 was filed for the project. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $483,584, which includes construction, contract administration, inspection, <br />testing, and an authorized contingency. <br />The following table summarizes the funds budgeted and available in current FY 22-23 <br />for expenditure to deliver construction of this project. Any remaining balances not <br />expended at the end of the fiscal year will be presented to City Council for approval of <br />carryovers to FY 2023-24. <br />
The URL can be used to link to this page
Your browser does not support the video tag.