My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 Local Street Preventative Maintenance FY 2022-23
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 19 Local Street Preventative Maintenance FY 2022-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:39:25 PM
Creation date
8/10/2023 11:19:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Contract for Local Street Preventative Maintenance FY 2022-23 <br />May 16, 2023 <br />Page 4 <br />Fiscal <br />Accounting Unit <br />Fund <br />Accounting Unit, Account <br />Year <br />- Account No. <br />Description <br />No. Description <br />Amount <br />Project No. <br />EXISTING BUDGET <br />03217662-66220 <br />Measure M- <br />Measure M2 Local Fairshare <br />2022-23 <br />(23-6907) <br />Street <br />St, Improvements Other Than <br />$2,778,000 <br />Construction <br />Building <br />ADDITIONAL BUDGET/BUDGET REALLOCATION <br />Public Works -Storm Drain <br />2022-23 <br />22317660-66220 <br />Drainage Area <br />Construction AREA III, <br />$ 38,609 <br />(19-6617) <br />Fee <br />Improvements Other Than <br />Building <br />Public Works -Storm Drain <br />2022-23 <br />22317660-66220 <br />Drainage Area <br />Construction AREA III, <br />$ 248,391 <br />Fee <br />Improvements Other Than <br />Building <br />03217662-66220 <br />Measure M- <br />Measure M2 Local Fairshare <br />2022-23 <br />(20-6907) <br />Street <br />St. Improvements Other Than <br />$ 171,343 <br />Construction <br />Building <br />03217662-66220 <br />Measure M- <br />Measure M2 Local Fairshare <br />2022-23 <br />(21-6907) <br />Street <br />St. Improvements Other Than <br />$ 98,516 <br />Construction <br />Building <br />03217662-66220 <br />Measure M- <br />Measure M2 Local Fairshare <br />2022-23 <br />(22-6907) <br />Street <br />St. Improvements Other Than <br />$ 505,341 <br />Construction <br />Building <br />Additional Budget/Budget Reallocation Total <br />$1,062,200 <br />Complete Total <br />$3,840,200 <br />EXHIBIT(S) <br />1. Location Map <br />2. Construction Plans <br />3. Bid Proposal <br />4. Construction Contract <br />5. Cost Analysis <br />6. FY 2022-23 Capital Improvement Program Sheet <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.