My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Agreements for On -Call Landscape Architectural Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 21 - Agreements for On -Call Landscape Architectural Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:02:32 PM
Creation date
8/10/2023 11:21:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 1 Statement of Qucdifi� otions <br />IARGE 'LATIN, <br />Z GATHERINO <br />rcr RIDGE <br />q <br />A. <br />4 <br />EN HANCCAAFN? <br />Q, <br />AV �t <br />il 't.'INDUSTRIAL <br />PARK <br />-V (ROWN55AFFY W <br />OACE -00 <br />CROCKER PARK <br />RECREATIONAL TRAIL MASTER PLAN <br />BRISBANE, CA <br />NOTABLE INFO & STATS: <br />Client: City of Brisbane <br />Project Timeline: 2020-2021 <br />Project Size: 2.25 in iles <br />RRM SERVICES PROVIDED: <br />LaiidscapeAt-ciiitecttii-e,Engineet-iiig <br />L - <br />- H�A <br />M100i , 1 <br />$CHM <br />LEr,END <br />HAIUKE FtAy <br />-U -.- <br />S7AWN 10CATION <br />X;k P0100147011 GAP DIN a <br />HAOIIAI INHANCEMMI <br />POTEP111AI[StASOMM <br />"�'IANDS <br />CRQSSINr <br />r <br />SMCtY tNHAIYCEMJNI <br />CONWL-I-NG SIXES <br />r LARGE swmr, L <br />G&THESINGSPACF <br />SMSBANP <br />LACCON <br />L!IRA L HE <br />�QN <br />DOWNIOWN <br />BRISBANE <br />RRM Design Group lead a design effort with the City of <br />Brisbane to develop an informed and practical Master <br />Plan for the Cracker Park Recreational Trail, a 2.25-mile <br />loop trail in the former Southern Pacific Railroad right- <br />of-way. The Master Plan is informed by guidance and <br />direction received from stakeholder groups, community <br />outreach meetings, a biological constraints assessment, and <br />traffic analysis memorandum. The Master Plan highlights <br />opportunities desired by the community and stakeholders to <br />improve the connectivity and safety, preserve local sensitive <br />environments, promote recreation on the trail, embrace <br />public art and interpretive education, and plan for the trail's <br />legacy. The improved path will provide a safe connection <br />between residential areas to the center of town and activity <br />centers, such as parks, the library, transit stops, and future <br />development in the priority development area. <br />r r m <br />
The URL can be used to link to this page
Your browser does not support the video tag.