Laserfiche WebLink
MONTEREY BAY <br />SANCTUARY SCENIC TRAIL AND <br />SEGMENT 7 RAIL TRAIL <br />SANTA CRUZ, CA <br />NOTABLE INFO & STATS: <br />Client: Santo Cruz Countj, Regional <br />Transportation Commission <br />(Seg inen t 7 - Chen t: City of Son to Cruz) <br />Project Timeline: 2011 -Curren t <br />RRM SERVICES PROVIDED: <br />Civil Engineering, Trail Planning, <br />LandscapeArchitecture, Mapping, and <br />PLIMC OL/treach <br />0 <br />JN I <br />Outstanding Plan Award <br />Association ofEnvironmental Profiessiowfis <br />A <br />WK k . <br />,Ik Stateriieiitcj]'QLicilificatiot)s I SECTION T <br />RRM Design Group is leading an effort on behalf of the <br />Santa Cruz County Regional Transportation Commission to <br />develop a braided trail network with the rail corridor serving <br />as a continuous muld-use trail spine to provide alternative <br />transportation and coastal access along Santa Cruz County's <br />40-mile-long coast. Implementation of this key transportation <br />corridor will allow greater transportation options to more <br />than 80 parks, 25 schools and over half of the county's <br />population who live within one mile of the corridor. RRM <br />is currently preparing construction documents for the 2.2- <br />mile long segment that runs through the City of Santa Cruz <br />and includes twelve (12) at -grade trail crossings, pedestrian <br />and bike bridges, extensive retaining walls, and flood control <br />C, ;1;�; <br />"It"t <br />I can't speak h0h1j; enough about RRM <br />Design Group. Thy are literally the best <br />consulthW firm I have ever worked with. <br />Coiy Caletti, Former -Senior 7ronsportation Plapinei; <br />Regional Transporta tit) e? Commission of5anta Cruz County <br />City of-5anto Ana I PROPOSAL FOR ON -CALL LANDSCAPE ARCHITECTURAL SERVICES <br />15 <br />