My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Agreements for On -Call Landscape Architectural Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 21 - Agreements for On -Call Landscape Architectural Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:02:32 PM
Creation date
8/10/2023 11:21:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . . . . . . . . <br />BRACE CANYON PARK, BURBANK <br />Project Description: Brace Canyon Park includes existing <br />natural grass sports fields over an existing concrete reservoir <br />as well as an unpaved walking path. The city has eliminated <br />the use of pesticides in their park programs and seeks to <br />reduce the use of water so they chose to replace the natural <br />fields with synthetic turf. The concrete reservoir is roughly <br />30" below existing grades and was built in the 1940's. Load <br />requirements and access points are critical design criteria <br />that must be followed. Verde Design is currently designing <br />construction drawings for this project. <br />Client: City of Burbank <br />Nick Heilein, Assistant Superintendent of Business <br />24930 Avenue Stanford <br />Santa Clarita, CA 91355 <br />661.295.5306 1 nheinlein@saugus.org <br />Services: Master planning, conceptual design, public <br />outreach, consensus building, and construction documents <br />Program: <br />• Synthetic turf replacement of natural fields <br />• Striping for softball, flag football, soccer and lacrosse <br />• New sports fencing <br />• New all weather track surfacing <br />• Spectator seating <br />• Stormwater quality improvements <br />Consultant PM: Chris Giannini <br />Size: 4.6 acres <br />Construction Cost: N/A (in design) <br />Schedule: In design phase <br />I 0361-11:1=11 IN11 M, I I ON to] 2*14 �11 kyj I G:1 0 Lei 1 1:1:1 IN 101 MMM191 H 1:1 W-11 W11 MCI DOM Lel RUM "N <br />JP0 <br />40� <br />449 <br />A A. I 'Rill �&*T' t-117- T <br />
The URL can be used to link to this page
Your browser does not support the video tag.