My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Agreements for On -Call Landscape Architectural Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 21 - Agreements for On -Call Landscape Architectural Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:02:32 PM
Creation date
8/10/2023 11:21:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . . . . . . . . <br />FAIR OAKS PARK, SUNNYVALE <br />Project Description: Verde Design was selected by the City <br />of Sunnyvale for the renovation of Fair Oaks Park, a 15-acre <br />community park located in Northern Sunnyvale, originally built <br />in 1969. The design includes the replacement of the existing <br />athletic field turf with synthetic turf for its baseball, soccer, <br />and multi -use fields. This is the City's first park with synthetic <br />turf, which will reduce annual water usage and significantly <br />increase play time during high rainfall seasons. In addition <br />to the fields, the Verde Design team worked with the Magical <br />Bridge Foundation and City staff for an all-inclusive playground <br />to be incorporated within the park design. The project also <br />included hardcourt improvements, expanded picnic areas, and <br />circulation and infrastructure improvements. <br />Program: <br />• Conversion of natural grass field with synthetic turf fields <br />• Renovation of picnic areas and park amenities <br />• Magical Bridge Playground - universally accessible play <br />areas for children of a wide range of abilities and ages with <br />custom playhouse <br />• Reconstruction of hardcourts <br />• Maintenance building renovation <br />• New restrooms/concessions building <br />• Upgrade to existing sports field and pedestrian site lighting <br />• Dog park with DG surfacing <br />Services: Community facilitation, site design, construction <br />documents, and construction administrative services <br />Client: City of Sunnyvale <br />Jim Stark, Superintendent of Parks Department of PW <br />6221 Commercial Street <br />Sunnyvale, CA 94085 <br />408.730.7596 1 jstark@sunnyvale.ca.gov <br />Consultant PM: Mark Baginski <br />Size: 15 acres <br />Construction Cost: $16.75 million <br />Schedule: Construction completed June 2022 <br />PROJECT AWARD <br />American Public Works Association (APWA) <br />m <br />viror <br />2OF22 Environmental Project of the Year Award: >$275M <br />RUM "N' <br />P r 74 <br />IN, qP <br />40� <br />A. rotIX, IM IA7L W-VWx RJF,7148 �4t <br />
The URL can be used to link to this page
Your browser does not support the video tag.