BUTIER
<br />C�mefk,"Iqr eirmom, wnsJoUro r'.0M",q
<br />EDUCATION
<br />Constructbn Apprentioeship.
<br />11
<br />Rio Hondo College: Whittier,
<br />CA, 1981
<br />Constructior Management,
<br />Pasadena College;
<br />Pasadena, CA, 1978
<br />LICENSES /
<br />CERTIFICATIONS
<br />ICC Reinforced Concrete
<br />Special Inspector
<br />No.6057063
<br />Exp. 0113112019
<br />Amertcan Concrete Institute
<br />Fluid Testing Technician -
<br />Grade I Carfification
<br />Exp. 11 /1 W201 9
<br />YEARS WITH FIRM
<br />18 years
<br />AVAILABILITY
<br />100%
<br />Bart Crawford
<br />Lead Inspector
<br />Prof*ssional Summary
<br />Mr. Bart Crawford came to Butler from the Metropolitan Water District, Los
<br />Angeles, where he spent over five years as an inspector. His heavy
<br />construction experience and knowledge of methods and equipment have
<br />facilitated an expertise in concrete and steel structures, various types of form
<br />work, bridge construction, controlled blasting, pre -stress, earth work, roadway
<br />improvements, rack bollIng, reinforcing steel, tunneling, metal decking,
<br />architectural/intedor finish. As an inspector for Butler, Mr, Crawford works
<br />primarily on water capital improvement projects, including water and
<br />wastewater treatment plants, pipelines, pump stations, and reservoirs. His
<br />inspection duties typically include utility/agency coordination, submittals, RFI
<br />and field memo responses, interpretation of drawings and general
<br />correspondence with design engineer. His background includes 18 years of
<br />union carpentry.
<br />Mr. Crawford provides both pipeline encasement construction and pipeline
<br />inspection experience to water projects. Pipeline work has involved piping for
<br />filtration plants, domestic water 11nes and reservoirs, Pipe material has
<br />included CML&Q and ductile iron, Experience has also Included flow Measure
<br />and flow metering for 144" and 66" lines, and tunneling.
<br />Project Experience
<br />Lead Inspector, Groundwater Reliability Improvement Project (GRIP)
<br />Advanced Water Treatment Facility Project; Water Replenishment
<br />District of Southern California (Value: $100 million) —Mr. Crawford is
<br />providing field inspection services as a part of GHD's Owner's Agent/Owner's
<br />Engineer team for the GRIP Advarced Water Treatment Facility Project. As a
<br />part of the GRIP Program, an advanced water treatment facility is being
<br />constructed to purify 10,000 acre feet (3,25 billion gallons) of tertiary treated
<br />(recycled) water annually. The GRIP AWTF is being built on a 5.2 acre
<br />property in the City of Pico Rivera, adjacent to the San Gabriel River. The
<br />GRIP AWTF will Include the following treatment processes: automatic
<br />strainer; microfiltration (MF) and reverse osmosis (RO) followed by ultraviolet
<br />advanced oxidation (UVAO),, cartridge filtration; decarbonation; and pH
<br />adjushTmnt/corrosivity stabilization.
<br />Lead Inspector, Chino Creek Well Field Equipping -Wells 11-16,11-17, and 111-
<br />18; Chino, CA; Chino Basin Desalter Authority (Completion: 2013;
<br />Value: $1.5 ml Illon)—Provided Inspection services for the Equipping of
<br />Chino Creek Well Field Wells 1-16,1-17 & 1-18 project. The groundwater wells
<br />were equipped as part of the CDA Phase 3 Expansion Project, In addition to
<br />well equipping, the project included the installation of 625 LF of Wdiarneter
<br />HDPE corrugated storm drain pipe and the grading and paving of the well
<br />sites- Coordination with other projects was required, including connection of
<br />well discharge lines to the Chino Creek Well Field Raw Water Pipeline. The
<br />project also involved coordination with the City of Chino to secure the
<br />required permits,
<br />
|