Laserfiche WebLink
BUTIER <br />C�mefk,"Iqr eirmom, wnsJoUro r'.0M",q <br />EDUCATION <br />Constructbn Apprentioeship. <br />11 <br />Rio Hondo College: Whittier, <br />CA, 1981 <br />Constructior Management, <br />Pasadena College; <br />Pasadena, CA, 1978 <br />LICENSES / <br />CERTIFICATIONS <br />ICC Reinforced Concrete <br />Special Inspector <br />No.6057063 <br />Exp. 0113112019 <br />Amertcan Concrete Institute <br />Fluid Testing Technician - <br />Grade I Carfification <br />Exp. 11 /1 W201 9 <br />YEARS WITH FIRM <br />18 years <br />AVAILABILITY <br />100% <br />Bart Crawford <br />Lead Inspector <br />Prof*ssional Summary <br />Mr. Bart Crawford came to Butler from the Metropolitan Water District, Los <br />Angeles, where he spent over five years as an inspector. His heavy <br />construction experience and knowledge of methods and equipment have <br />facilitated an expertise in concrete and steel structures, various types of form <br />work, bridge construction, controlled blasting, pre -stress, earth work, roadway <br />improvements, rack bollIng, reinforcing steel, tunneling, metal decking, <br />architectural/intedor finish. As an inspector for Butler, Mr, Crawford works <br />primarily on water capital improvement projects, including water and <br />wastewater treatment plants, pipelines, pump stations, and reservoirs. His <br />inspection duties typically include utility/agency coordination, submittals, RFI <br />and field memo responses, interpretation of drawings and general <br />correspondence with design engineer. His background includes 18 years of <br />union carpentry. <br />Mr. Crawford provides both pipeline encasement construction and pipeline <br />inspection experience to water projects. Pipeline work has involved piping for <br />filtration plants, domestic water 11nes and reservoirs, Pipe material has <br />included CML&Q and ductile iron, Experience has also Included flow Measure <br />and flow metering for 144" and 66" lines, and tunneling. <br />Project Experience <br />Lead Inspector, Groundwater Reliability Improvement Project (GRIP) <br />Advanced Water Treatment Facility Project; Water Replenishment <br />District of Southern California (Value: $100 million) —Mr. Crawford is <br />providing field inspection services as a part of GHD's Owner's Agent/Owner's <br />Engineer team for the GRIP Advarced Water Treatment Facility Project. As a <br />part of the GRIP Program, an advanced water treatment facility is being <br />constructed to purify 10,000 acre feet (3,25 billion gallons) of tertiary treated <br />(recycled) water annually. The GRIP AWTF is being built on a 5.2 acre <br />property in the City of Pico Rivera, adjacent to the San Gabriel River. The <br />GRIP AWTF will Include the following treatment processes: automatic <br />strainer; microfiltration (MF) and reverse osmosis (RO) followed by ultraviolet <br />advanced oxidation (UVAO),, cartridge filtration; decarbonation; and pH <br />adjushTmnt/corrosivity stabilization. <br />Lead Inspector, Chino Creek Well Field Equipping -Wells 11-16,11-17, and 111- <br />18; Chino, CA; Chino Basin Desalter Authority (Completion: 2013; <br />Value: $1.5 ml Illon)—Provided Inspection services for the Equipping of <br />Chino Creek Well Field Wells 1-16,1-17 & 1-18 project. The groundwater wells <br />were equipped as part of the CDA Phase 3 Expansion Project, In addition to <br />well equipping, the project included the installation of 625 LF of Wdiarneter <br />HDPE corrugated storm drain pipe and the grading and paving of the well <br />sites- Coordination with other projects was required, including connection of <br />well discharge lines to the Chino Creek Well Field Raw Water Pipeline. The <br />project also involved coordination with the City of Chino to secure the <br />required permits, <br />