My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:04:33 PM
Creation date
8/10/2023 11:29:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HUTIER <br />n. M, N'l ff'?Rh'C'.rA <br />Bart Crawford <br />Lead Inspector <br />Lead Inspector, Edward C. Little Water Recycling Facility Phase V <br />Design -Build Expansion; El Segundo, CA (West Basin Municipal Water <br />Distrlct�—Provided inspection services for the Phase V Design -Build projecl. <br />West Basin expanded Title 22, Barrier Water and Low Pressure Boller Feed <br />water treatment processes. The Phasp V project involved expanding the Title <br />22 pretreatment capacity by 10 MGD to achieve a total treatment capacity of <br />40 MGD. along with expanding the Bafrier Water production from 12.5 MGD <br />to 17.5 MGD and the Low Pressure Boiler Feed water production frurn 11.7 to <br />2.2 MGD to serve Singlo-Pass RO water to NRG's El Segundo Power Plant. <br />The Phose V project addressed nUM01'OUS capacity expansion and tre.itrnem <br />process upgrades, The project included Ozone-Microfiltration Pretreatment <br />Process; West Coast Barrier; El Segundo Power -Low Pressure Boller Feed <br />Water; Title 22 Faclllty-High Rate Clarifier Expansion; Title 22 Pump Station; <br />Chemical Facilities; and miscellaneous Civil work. <br />Lead Inspector, Chino ll Desalter Concentrate Reduction Facility; <br />Jurupa Valley, CA: Chino Basin Desafter Authority (Value; $46.6 million; <br />Com plail an: 201 5�—Mr. Crawford was the Lea d I nspector for the CRF <br />groundwater treatment facility. which is one of Lwo plants managed by the <br />Chino Basin Desalter Authority. Both [on exchange (IX') and reverse osmosis <br />(RO) treatment trains arp used to treat brackish groundwater from eight wells <br />that also have elevated nitrate conr;entrations. The projeM scopf) included <br />construction of new *oflemng, clarification, filtration, and secondary RO <br />(SRO) treatment and solids dewatering and storage; installaflon of a now <br />decarbonalor, installation of a new transfer purnp with motor with associated <br />VFD and motor controls and discharge piping arid valves; instaflation of new <br />cartridge filters; modifiration of the existing sulfuric acld chemical system: <br />modification of the existing threshold inhibitor dierrilral system: and site <br />modifications, including now fencing and pates, yard piping, and storryi drain <br />replacement, <br />Resident Engineer, Chino Desafter Reliability Project; Chino, CA; Chino <br />Basin Desialter Authority (Completion: October 2017; Value: $3.8 <br />million)—Butier provided CM and inspectlon servic" foi thH Chino I Reliability <br />Project located at the existing Chino I Desalter. The project scope includ ed tho <br />following., now building built on 10 the existing Chino I Degallarfadlity' now RID <br />tran lied into the existing feed water, permeate, concentrate, and CIP piping <br />manifolds; niodiflcation of the existing sulfuricacid charnical systein by <br />replacing two existing metering PUMPS and furnishing and installing two <br />metering purnps; trench overflow constructed and connected beluw the air gap <br />that convoys water to the brine line; slun y sea I all existing and now asphalt <br />Rurraces: coating of the exterior of the existing procass builOng to inatch the <br />new process building exterior coating system; and coating of all existing <br />trenches. <br />
The URL can be used to link to this page
Your browser does not support the video tag.