Laserfiche WebLink
These sections define requirements and <br />procedures for checking, reviewing. distributing, <br />tracking, and controlling documents for QA/QC. <br />The project specific QKQC Plan will be <br />submitted and reviewed by the C4ty prior to <br />submittal of other project doliverables. The <br />individuals perfon-ning QAIQC reviews will be <br />clearly indicated In the project organization <br />chart. Dellverables, will contain a statement that <br />the Information containad in the submittal has <br />been quality control checked in accordance with <br />the QA1QC Plan. <br />Quallty Assurance is the confirmation <br />process that all procedures directing [he work <br />have been developed and followed and any <br />corrective actions required have been <br />Implememed. Procedures or actions to be <br />CDnfirmed include: <br />Construction management plan; <br />Training of staff in QAIQC requirements; <br />Submittal process plan; <br />Document control plan; <br />Identification of City approvals at <br />appropriate milestones; <br />Control of testing to determine validity and <br />accuracy of data collected in the field; <br />Calibration and testing of equipment; <br />Identification of the need for corrective <br />action; and <br />Audit to verify compliance with the QA/QC <br />Plan. <br />Quality Control is the actual checking and <br />validation of the inputs and outputs of the <br />work, Activities to be verified for the work <br />include the following: <br />• Review by quality control team; <br />• Identification and compliance with <br />applicable codes, ordinances, permits, <br />environmental requirements, etc,; <br />• Review input data and check calculations; <br />City of Santa Ann, Public Works Agency <br />Construction Engineering Services for the <br />San Lorenzo Sewage Lift Station, PFP No. 16-049 <br />6 Review drawings, specifications, technical <br />reports, memos, meeting minutes; <br />0 Perform constructability, operabIlity, <br />maintainability, and usability reviews; and <br />0 Review design for compliance with safety <br />standards. <br />The Principal -In -Charge and Project Manager <br />will prepare a specific CM Communications <br />Manual for the San Lorenzo Sewage Lift <br />Station Project to be approved by the City, <br />The manual Will include project <br />correspondence and other forms of <br />communication in accordance with the Cii:y's <br />document formatting standards. The manual <br />will integrate the interdependent roles of the <br />City, Construction Manager, Design Engineer, <br />and the Contractor, through pre -construction, <br />mobilization. construction, and acceptance of <br />the phases of the work. The Communication <br />Manual will Include the following: <br />Project Organization: Individual <br />assignments, responsibilities, phone <br />numbers, lines of communication, and <br />methods for interfaGing with the City, <br />project stakeholders, and the Contractor, <br />Organization chart showing relationships <br />between the parties. <br />0 Project Control: Description of cost, <br />,schedule and document control systems. <br />0 Communication Management: <br />Procedures for documenting <br />communications and correspondence; <br />distribution and/or routing lists; and <br />examples of all forms that the Contractor <br />will be required to use. <br />a Meeting/Notice Procedures: <br />Schedules, notices, agendas, reporting <br />procedures, documentation requirement,%, <br />and timely acceptance processes, <br />QAIQC: Procedures, laboratory testing, <br />field-testing, coordination checks, and <br />BUTIER <br />C. UNDERSTANDING OF NEWED <br />