My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Our technical support team are provided below. <br />David Krommenhoek, PILS <br />Project Role <br />Percent Available: 40% <br />Right of Way Engineering <br />Jocelyn Limas, PLS <br />Project Role <br />Percent Available: 40% <br />Right of Way Engineering <br />Susana Barrientos <br />Project Role <br />Percent Available: 40% <br />Right of Way Engineering <br />Ross Khiabani, PE, GE <br />Project Role <br />Percent Available: 40% <br />Geotechnical Studies and Reports <br />Ramon Calbay <br />Project Role <br />Percent Available: 40% <br />Geotechnical Studies and Reports <br />Joseph Ritchey <br />Project Role <br />Percent Available: 40% <br />Geotechnical Studies and Reports <br />Matthew Crim <br />Project Role <br />Percent Available: 40% <br />Civil DrafterlDesigner <br />Chris Stone <br />Project Role <br />Percent Available: 40% <br />Civil Drafter/Designer <br />Michael Chou <br />Project Role <br />Percent Available: 40% <br />Civil Drafter/Designer <br />Yocelin Cruz, ENV SP <br />Project Role <br />Percent Available: 40% <br />Civil Drafter/Designer <br />Camryn Lopez, EIT <br />Project Role <br />Percent Available: 40% <br />Civil Drafter/Designer <br />Bernardo Reyes <br />Project Role <br />Percent Available: 40% <br />Civil DrafterlDesigner <br />Randy Shadowen <br />Project Role <br />Percent Available: 40% <br />Civil Drafter/Designer <br />Kenneth Krieger <br />Project Role <br />Percent Available: 40% <br />Hydrology/Hydraulic Analyst <br />Sheila McCracken <br />Project Role <br />Percent Available: 40% <br />Hydrology/Hydraulic Analyst <br />Bryan Nguyen, RLA <br />Project Role <br />Percent Available: 40% <br />Planting/Irrigation Architect <br />Carlos Espinoza, RLA <br />Project Role <br />Percent Available: 40% <br />Planting/Irrigation Architect <br />Christopher Kelley, PE, QSD/P <br />Project Role <br />Percent Available: 40% <br />Water Quality Engineer <br />Robert Burch <br />Project Role <br />Percent Available: 40% <br />Traffic Designer/Drafter <br />Comprehensive, Innovative. Trusted. <br />Proposal for On -Call Engineering, 13 <br />RFP No. 23-030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.