My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Project Organization <br />The organization chart presented below identifies our key personnel and illustrates the communication and reporting relationships and project roles forWilldan's key team. This <br />chart illustrates current Willdan employees and represents the depth of technical support personnel that may be utilized for an on -call project award. This is farfrom an <br />exhaustive list of our staff resources. Willdan understands that key staff cannot be replaced without consent of the City. Our organization chart includes our two subconsultants <br />and depicts their line of reporting and communication. Resumes for Key staff have been included on the following page. <br />Right -of -Way Engineering Environmental Compliance Sewer/Storm DrainlWater Design <br />David Kromrrienhoek, PLS and permitting Christopher Kelley, PF, QSDiP <br />Jocelyn Limps, PLS Christine Kudija, AlCP, JD Kenneth Krieger <br />Susana Barrientos Andrea Urbas, AlCP, CED, CEP Sheila McCracken <br />Field Survey <br />Rosell Surveying & Mapping, Inc. <br />Geotechnical Studies and Reports <br />Ross Khiabani, PE, CE <br />Ramon Calbay <br />Joseph Ritchey <br />Civil Design <br />Traffic Design <br />Matthew Crim <br />Robert Burch <br />Chris Stone <br />Kevin Custado, EIT <br />Yocelin Cruz, ENV SP <br />Maryanne Troung, ENV SP <br />Huh-Pyng Chou, EIT <br />Reginald Greene <br />Camryn Lopez, EIT <br />Traffic Studies <br />Bernardo Reyes <br />Randy Shadowen <br />Farhad Iranitalab, PE, TE <br />Hernando Cotangco, TE <br />Utility Coordination <br />Nicole Sparn, PF, TF <br />Tamara Boeltl <br />Emilio Murga, EIT <br />Joanne ltagakl <br />Landscape Design <br />Brian Nguyen, RLA <br />Carlos Espinoza, RLA <br />Hydrology1hydraulics <br />Kenneth Krieger <br />NPDES <br />Joseph Bellorno, PL, QSD/P <br />Kelsey Reed, CESSWI, QSD <br />Mayra Martinez <br />Parsina Hanna <br />SWPPPIWQMD <br />Telal Gandhi, PE, QSDIP <br />Christopher Kelley, PE, OSD/P <br />Added Value Service — Construction Management and Inspection <br />Resident Engineer <br />Michael Jasmirski, PF, LEED AP, <br />0SHPD-A <br />Mohammad Sarniee, PE, CSP <br />Construction Management <br />Joseph Pul <br />Duane Soileau, QSP, CESSW <br />Jason Brown <br />Mario Cisneros <br />Inspection <br />Dennis Parker <br />Cesar Cantuba <br />Paul Merrill <br />Michael Palen <br />Jeffrey Polls <br />Brent Jablonowski <br />Simon Hernandez <br />Holoodoro Espinosa <br />Labor Compliance <br />Jane Frail <br />Amanda Perez <br />Proposal for On -Call Engineering, <br />W"Comprehensive, Innovative, Trusted. Rl No. 23-030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.