Laserfiche WebLink
City of Santa Ana <br />comments, a final report incorporating the comments will be provided to the City. The report will be supported with a map illustrating <br />boring/core locations and a summary of laboratory test results. <br />Subtask 4.04 — Preliminary Design Report Willdan will compile a Preliminary Design Report (PDR) for review and approval by <br />the City. The report will contain a summary of the initial reconnaissance notes, utility. Subtask 4.04 Deliverables <br />provided information, field survey findings, any photographs of conditions for discussion, - Preliminary Design Report <br />and the base design concept with preliminary construction cost estimate. The report will <br />be discussed with City representatives to make reliable, cost effective decisions about the proposed street improvements, water and <br />sewer rehabilitation/replacement methods. <br />During preparation of the PDR, Willdan will review existing information, such as the pavement management report, city sewer and <br />water documents and field review of the street to make recommendations regarding the construction needs, including the location <br />and extend of missing or damaged sidewalk, curbs and gutter, access ramps, driveways, sewer and water repairs. In addition, the <br />report will address the disposition of existing utilities and coordination, and anticipated requirements. <br />Task 5 — Plans, Specifications, and Engineer's Estimate - Option A and Option B <br />Subtask 5.01 — Construction Plans. <br />Willdan will prepare conceptual plans for City review, comment and Task 5.01 Deliverables <br />approval. Upon approval of the concept plans, the final design phase - Three hard copies of full-size conceptual plan layout and <br />will be initiated. Willdan will submit plans at the 30-, 60-, and 100- one electronic PDF format <br />percent levels of completion. The City will provide review comments at - Three hard copies of full-size and half-size plan submittals <br />all design stages. Willdan will address comments received from the at 30-, 60-, and 1 00-percent completion milestones, one <br />submittal reviews, including comments received from other affected electronic PDF copy, and one electronic Microstation copy <br />agencies and utilities. Willdan will submit one, original, signed set of in V8i format. <br />full-sized plans, a signed, unbound, set of final specifications, and a copy of the final engineer's opinion of construction cost to the City. <br />One set of Mylars will be produced after 100% plans are approved by the City (upon request). Plans will conform to City standard plans <br />and CADD standards and be prepared utilizing Microstation V8i software. <br />Option A: The plans be prepared in sufficient detail to bid the rehabilitation of the identified well — method to be determined by the City <br />after review of the assessment report — and the proposed sewer and water facilities. Utility plans will be drafted at 40-scale and plans will <br />display all referenced standard plans including trenching details. <br />Option 13: The plans will consist of a Title SheeV Typical notes, Roadway Plans, Construction Details, Signing and Striping, Landscape, <br />and Storm Water Biofiltration (if required in complete streets). The Roadway Plans will consist of two sheets and will be drafted at 20- <br />scale. The Roadway Improvement Plans will include the topographic survey and utility base plan information, limits of removal, and limits <br />of repairs for pavement, curb and gutter, driveway configuration, ADA curb ramps, etc. All other improvement plan sheets will be drafted <br />at 40-scale. <br />Subtask 5.02 — Specifications. 8 Task 5.02 Deliverables <br />Willdan will prepare technical special provisions for bidding per City One electronic PDF copy and one electronic Word copy of <br />standards. The City will provide boilerplate specifications. Special technical and special provisions at 60- and 1 00-percent <br />provisions will be prepared utilizing Greenbook and Caltrans formats completion milestones <br />(latest editions). <br />Subtask 5.03 — Engineer's Construction Cost Estimate. <br />Willdan will prepare a construction cost estimate to accompany the 30-, 60-, Task 5.03 Deliverables <br />and 100-percent plan deliverables. Quantity calculations and final construction - One electronic PDF copy and one electronic <br />cost estimates will be prepared in accordance with City requirements to Excel copy of engineer's cost estimate at concept <br />establish the project budget. and 30-, 60-, and 1 00-percent completion <br />milestones <br />Task 6 — Construction Bidding Phase Services - Option A and Option B <br />Willdan will prepare a construction bid package per City standards. <br />Willdan will advise the City of the appropriate responses to bidders' Task 6 Deliverables <br />technical questions. If an addendum is determined appropriate by the . Construction bid package <br />City, Willdan will prepare revised plans, specifications, and/or quantity . Addenda, as necessary <br />estimates. Willdan will provide support during construction bidding 0 Log of bidder inquiries <br />phase services and advertising period by: <br />Attending pre -bid meeting <br />Assisting in analysis of bids, as necessary <br />Logging questions and responses to bidders' questions regarding the bid documents <br />Proposal for On -Call Engineering, 17 <br />M/Comprehensive, Innovative, Trusted. RFP No. 23-030 <br />