My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reagan & Peterson Park Parking Lot Rehabilitation <br />Diamond Bar, CA <br />TAIT was hired by the City of Diamond Bar to analyze, design and conduct <br />construction management and inspection services for the expansion of two <br />public park parking lots. The design services included topographic survey, <br />geotechnical investigation, water quality management design, Los Angeles <br />County Flood Control District storm drain permit processing, and the <br />preparation of detailed PS&E forthe construction of the park improvements. <br />Design analysis included addition of handicapped parking stalls, design of <br />optimal cross and longitudinal grades and the installation of retaining curbs <br />to optimize the parking stall configuration. Extensive coordination between <br />the City's public works and Park Maintenance Division was required in order <br />to ensure the design was both in compliance with public works standards as <br />well as the park division's ultimate master plan. <br />Harbor Boulevard Water & Street Reconfiguration <br />Garden Grove, CA <br />This project included street reconfiguration (approximately 1/3-mile total <br />length), improvements to an existing raised median, a new traffic signal, <br />abandonment of existing 8-inch ACP and 12-inch DIP City water lines, <br />installation of a 800 LF of 16-inch water line, relocation of SCE and AT&T <br />main distribution service lines, and the installation of new public storm <br />drains and sewer and water services to accommodate a future <br />redevelopment project along Harbor Boulevard from Palm Street to <br />Lampson Avenue in the City of Garden Grove. Engineering services required <br />extensive research, review, and a potholing program for the installation of <br />the new utilities and storm drain improvements within the existing six -lane <br />Harbor Boulevard roadway. TAIT, working with City Water Department, <br />proposed the installation of a cut -in valve to ensure continuous water <br />service to a medical facility during the construction of the water line <br />improvements. The Construction Bid cost was approximately $1,400,000 <br />with a 2013 completion. <br />TAIT & Associates, Inc. <br />On -Call Engineering Services <br />Reference: <br />John Beshay <br />(909) 839-7043 <br />Key Staff: <br />PIC: Jacob Vandervis <br />QA/QC: Todd Schmieder <br />PM/CM: David Sloan <br />Client: <br />City of Diamond Bar <br />Construction Cost: <br />$575 K <br />Project Dates <br />2014-2015 <br />Reference: <br />Bill Murray, P.E. <br />(714) 741-5379 <br />Key Staff: <br />PIC: Jacob Vandervis <br />PM: Todd Schmieder <br />Client: <br />City of Garden Grove <br />Construction Cost: <br />$1.4 M <br />Project Dates <br />2012-2013 <br />TAIT <br />Page 1 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.