Laserfiche WebLink
Exhibit A: Relevant Project Experience Matrix <br />oa <br />W <br />z <br />Lu 4 <br />06 CY <br />a <br />.0 <br />0 <br />r_ r <br />E <br />:3 <br />06 0 <br />0 <br />-a <br />E <br />r_ <br />0 <br />.2 <br />0 Q <br />r_ C <br />W <br />0 <br />0 <br />CL <br />CL <br />Cn <br />0 0 <br />.4 .2 <br />> <br />0 <br />0) Q <br />0 <br />M <br />0 <br />.2 <br />1171 tm <br />0 C <br />0 7@ <br />-0 '0 <br />0 <br />r_ <br />0 <br />CL <br />r_ <br />CL <br />E <br />M <br />> <br />o <br />_ <br />CL <br />> <br />0 <br />CO) <br />0 <br />0 co <br />E — <br />= 0 <br />Firm Name <br />Project Name I Location4it <br />Year <br />Description Client <br />0 <br />0 <br />0 <br />E co <br />r <br />>' <br />X 2 <br />M <br />_J <br />(n E <br />LU <br />0 <br />Alta <br />Atwood Multi -Purpose Trail I Placentia, CA <br />2021—Ongoing <br />Concept plans, cost estimation, feasibility study, City of Placentia Public Works <br />0 <br />0 <br />0 <br />community outreach, & hydrology report Department <br />Alta <br />Safe Routes to School (SRTS) Plan & Safety Education <br />2017-2020 <br />Infrastructure improvements, traffic calming, cost <br />City of Santa Ana <br />1 0 <br />0 <br />0 <br />Campaign I Santa Ana, CA <br />estimate, & concept plan <br />Alta <br />LA River Path I Los Angeles, CA <br />2018—Ongoing <br />Alternatives analysis, environmental engineering, <br />Los Angeles County Metropolitan <br />0 <br />0 <br />0 <br />0 <br />0 <br />& final design <br />Transportation Authority (LA Metro) <br />Alta <br />Pedestrian and Bicycle Safety Improvements I Ojai, CA <br />2019—Ongoing <br />Class 11 and IV bike lanes & sidewalk-infill <br />City of Ojai <br />improvements <br />Alta <br />La Ballona Elementary Protected Bike Lane and SRTS <br />2017-2020 <br />Conceptual design through construction, two-way Class <br />City of Culver City <br />Culver City, CA <br />IV bikeway, traffic analysis, lighting, & streetscape <br />improvements <br />Alta, GMU, <br />Merced Avenue Linear Park and Traffic Calming <br />2020—Ongoing <br />Final design of bicycle facilities & pavement repair <br />City of El Monte <br />Craftwater <br />Improvements I El Monte, CA <br />Alta <br />Pershing Bikeway: North Park to Downtown Connector <br />2015—Ongoing <br />Preliminary study & engineering design for 2.6 <br />San Diego Association of <br />0 <br />0 <br />0 <br />San Diego, CA <br />mile two-way Class IV bikeway <br />Governments (SANDAG) <br />Alta, GMU, <br />Traffic Calming with Class IV Bike Lanes: Parkway Dr. and <br />2020—Ongoing <br />Design of Class IV bikeway, traffic calming, & <br />City of El Monte <br />40 <br />40 <br />0 <br />0 <br />0 <br />Craftwater <br />Denholm St. I El Monte, CA <br />pavement evaluation and repair <br />Alta <br />Adeline St. Civil Engineering Design I Berkeley, CA <br />2018-2020 <br />Traffic counts, analysis, & civil engineering for a <br />City of Berkeley <br />0 <br />0 <br />0 <br />Class IV bikeway <br />Alta, Calvada, <br />TOS 8 Curb Ramp Designs I Los Angeles, CA <br />2021—Ongoing <br />Infrastructure improvements to promote safety, <br />Los Angeles Bureau of Engineering <br />0 <br />0 <br />0 <br />GHD <br />inclusion, & sustainability <br />(LABOE) <br />Alta <br />Higuera St. Complete Streets and Neighborhood <br />2021—Ongoing <br />Class IV bikeway, buffered bike lanes, & <br />City of San Luis Obispo <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Greenway I San Luis Obispo, CA <br />intersection improvements <br />Alta <br />Multi -Corridor Civil Design Services Oakland, CA <br />2020—Ongoing <br />Final design, construction support, traffic <br />City of Oakland Department of <br />analysis, & civil engineering <br />Transportation <br />Alta <br />San Jose Creek Multi -Use Bikeway Pomona, CA <br />2022—Ongoing <br />PS&E for multi -use urban trail <br />City of Pomona Public Works <br />Department <br />GHD <br />Anaheim On -Call Professional Consulting and <br />2014—Ongoing <br />Various services including preliminary <br />City of Anaheim <br />Engineering Services <br />engineering & environmental documentation <br />HELIX <br />Engineering & Capital Projects Department As -needed <br />2011-2021 <br />Capital improvements including roadways, <br />City of San Diego <br />0 <br />161 <br />Environmental Services I San Diego, CA <br />bridges, water/sewer pipelines, parks & utility <br />Craftwater <br />Arroyo Seco-San Rafael Treatment Wetlands <br />2023—Ongoing <br />Feasibility Study and Final Design of two <br />City of Pasadena <br />stormwater diversions, treatment wetlands, and <br />stormwater harvesting facility for irrigation use <br />GMU <br />El Toro Road, Lake Forest Drive, and Bake Parkway <br />2021 <br />Assessment of pavement surface condition, <br />City of Lake Forest <br />Pavement Rehabilitation Project <br />deflection testing, AC corings, lab testing, & <br />engineering analysis. <br />Calvada <br />Eastbound SR-911/Atlantic Ave to Cherry Ave Auxilary <br />2019 <br />Land surveying services & aerial topographic <br />TRC/Los Angeles Metropolitan <br />Lane Improvement <br />survey <br />Transportation Authority (Metro) <br />Monument <br />Warner Avenue Widening I Santa Ana, CA <br />2019—Ongoing <br />Street expansion, Complete Streets improvement, <br />City of Santa Ana <br />I <br />1 0 <br />0 <br />I <br />I <br />I & right-of-way services <br />I <br />ALTA PLANNING + DESIGN, INC. Original Proposal For Rfp No. 23-030 On -Call Engineering Services 14 <br />