My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Well 32 Rehabilitation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 15 - Well 32 Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:57:05 AM
Creation date
8/10/2023 1:41:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well 32 Rehabilitation Project <br />May 2, 2023 <br />Page 2 <br />The Well 32 Rehabilitation Project is located at Morrison Park and includes construction <br />at the following three locations: Morrison Park; within the City street rights -of -way along <br />Westwood Avenue, Memory Lane, and Bristol Street; and at the John Garthe Reservoir <br />site (Exhibit 1). The scope of work includes the demolition of the existing underground <br />well vault and appurtenances, building a new above -ground well building with a pump <br />and electrical room, site improvements; Morrison Park improvements consisting of the <br />repair and resurfacing of the basketball and tennis courts, replacement of the tennis <br />court fence enclosure, and replacement of the court lighting and corresponding <br />electrical facilities. Within City street rights -of -way, the 12-inch well discharge piping, <br />with parallel fiber optic facilities, will be constructed from the well site at Morrison Park <br />to the John Garthe Reservoir site. At the John Garthe Reservoir site, the work includes <br />construction of a chemical building, which includes the City's standard disinfection <br />system, sodium hypochlorite generation equipment; restroom facility, associated on -site <br />piping including pressure control and chemical injection vaults, and electrical upgrades <br />to the John Garthe Pump Station. <br />Project Funding <br />In order to bring this critical piece of water infrastructure back online, staff has sought <br />additional funding sources to complete the project. In 2015, the City entered into an <br />agreement with the Orange County Water District that will allow the City to operate Well <br />32 beyond its Basin Equity Adjustment (BEA). This agreement allows the City to be <br />exempt from paying BEA fees above the normal limit, which in turn, will greatly reduce <br />pumping costs of the well up to $4,600,000. In 2018, the City received $750,000 in <br />federal Bureau of Reclamation grant funds for project construction. In 2022, the City <br />entered into a low -interest loan agreement with the California State Water Resources <br />Control Board under their Drinking Water State Revolving Fund for $5,249,105 of <br />additional funds, and will pursue additional funds through this program. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of <br />1542 regional vendors via PlanetBids, many of which are Santa Ana based. A total of <br />six bids were received, none of which were from Santa Ana contractors. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on November 29, and December 6, of 2022. The project was also <br />advertised on PlanetBids from November 28, 2022 through January 26, 2023. Bids <br />were received electronically via PlanetBids on January 26, 2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.