My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Agreement with David Evans and Associates, Inc. for Landscape (10th and Flower Park)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 17 - Agreement with David Evans and Associates, Inc. for Landscape (10th and Flower Park)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:04:54 AM
Creation date
8/10/2023 1:44:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and substantiated with independent calculations. <br />d) Electronic files for all CADD (in Microstation CONNECT), reports, and calculations shall <br />be submitted at the end of contract or when requested by the City. <br />e) All electronic software developed, databases generated, spreadsheets and intellectual <br />properties developed during the life of the Agreement shall become the properties of the <br />City. <br />2. Deliverable PS&E package: <br />a) 30% PS&E <br />The package shall include the final/approved concept layout and preliminary park <br />improvement plan, which includes hardscape, landscaping and irrigation, lighting, <br />cost estimate, and alley and parking lot improvements. <br />b) 60%, 90%, and 100% <br />1) The Consultant shall submit the following documents for review and approval: <br />Each milestone submittal shall include the electronic files of the following <br />documents: Plans, Standard Special Provisions (SSP), preliminary quantities <br />and estimates, pay item list, design calculations and all reports supporting the <br />design (i.e. geotechnical report, hydraulic report). <br />2) The City reviews and comments on the PS&E package within four (4) weeks <br />of receipt of the complete milestone PS&E package. <br />3) Constructability review meeting shall take place at 90% and shall include <br />Consultant and City engineering staff. Prior to the City conducting the <br />constructability review, the Consultant shall submit the QA/QC set of PS&E <br />performed by the Consultant independently. <br />4) The City may request a set of QA/QC plans and estimates at any point during <br />the design process to include methods for design and calculations. <br />5) The Consultant shall provide a final colored rendering of the project reflecting <br />all items identified within the final construction documents. <br />c) Final PS&E for Approval and Bidding <br />The Consultant shall submit all electronic files (CADD, Word document, and <br />Excel) and one set of PDF for the following documents for construction Bid <br />purpose: <br />City of Santa Ana RFP 22-124 <br />Page Al-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.