Laserfiche WebLink
1. Development of Plans, Specifications and Estimate (PS&E): <br />a) All reports, plans, specifications and quantity calculations shall conform to criteria, <br />policies, procedures and standards of the City. The Consultant shall use the boilerplate <br />for cut sheets, specifications and estimates provided by the City. <br />b) The plan development shall include four (4) milestone deliverables30%, 60%, 90% <br />(pre -final) and 100% (final). All plan sheets shall be prepared at a reasonable standard <br />scale to be noted on plans. The necessary plans for each PS&E package shall include, but <br />are not be limited to: <br />o Title Sheet <br />o Civil Engineering <br />o Erosion Control Plan <br />o Horizontal and Vertical Control Plan <br />o Parking lot and alley <br />o Grading (including precise) and On -Site Drainage plan <br />o Site Utility Plan (for drinking fountain) <br />o Basketball Court <br />o Skate Board Court <br />o Canvas Shade Structure <br />o Pedestrian Bridge <br />o Playground <br />o Decomposed Granite/Decorative Concrete Walkways <br />o Landscape and Irrigation <br />o Site Layout/Construction Plans and Details <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />o Monument Detail <br />o Electrical <br />o Electrical Site Plan to cover walkway, shade canopy, turf, <br />monument signs, basketball court, and parking lot <br />o Location of panels, switchgear, meters <br />o Single Line Diagram <br />o Schedules <br />o Details <br />o Photometrics <br />o General Notes <br />c) All calculations for the design and quantities shall be submitted as part of the PS&E <br />submittal requirements. Quantities for all contract pay items shall be substantiated by <br />calculations. Quantity calculations shall be neat and orderly and shall show all sketches, <br />diagrams, and dimensions necessary to allow them to be independently used by field <br />inspectors during construction. All quantity calculations shall be independently checked <br />City of Santa Ana RFP 22-124 <br />Page Al-4 <br />