My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Agreement with David Evans and Associates, Inc. for Landscape (10th and Flower Park)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 17 - Agreement with David Evans and Associates, Inc. for Landscape (10th and Flower Park)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:04:54 AM
Creation date
8/10/2023 1:44:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
5/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to provide <br />Landscape Architectural Design Services for loth and Flower Park — RFP No. 22-124 <br />boring. The pipe will be secured in the borehole and pea gravel filter pack will be poured down the borehole to <br />surround the pipe casing and hole bottom. Water will be added to the borehole until the water level is as near <br />the ground surface as can be achieved and allowed to pre-soak <br />Pre -Soaking: Pre-soaking will be done by inundating the borehole with water for at least one hour. <br />Test Procedure: After presoak, the borehole will be filled with water to 12 inches above the bottom and the <br />drop in water level in the borehole shall be observed. The following 2 conditions are utilized to determine the <br />time interval between readings. <br />■ If water remains in the hole after 10 minutes but drains before 30 minutes, the time interval between <br />readings shall be 10 minutes. <br />■ If water remains in the hole after 30 minutes, the time interval between readings shall be 30 minutes. <br />After completion of presoak, the borehole shall be inundated to a level less than or equal to the presoak depth. <br />For each successive infiltration test reading, the starting water level must be at this initial water depth. <br />A sounder shall be utilized to determine the water level during each test. All measurements of water level shall <br />be taken to the nearest 1/8-inch increment. Infiltration test readings shall be conducted a minimum of eight <br />times, or when a stabilized rate of drop has been obtained, whichever occurs first. A stabilized rate is defined <br />as when the highest and lowest readings of three consecutive infiltration tests are within 10 percent of each <br />other. The average of the stabilized rate over the last 3 consecutive test readings shall be used as the pre - <br />adjusted infiltration rate. <br />Attempts will be made to remove the pipe from the borings. If the attempts fail, the pipe will be abandoned in <br />place and the hole backfilled with soil cuttings <br />Laboratory Testing: Laboratory testing will include, but may not be limited to; In -situ moisture and dry density; <br />Soils corrosivity; R-value; Collapse; Expansion Index; Sieve analysis; Maximum density; and Direct shear. <br />Engineering Analyses and Report Preparation: Data obtained from the exploratory borings and the <br />laboratory testing program will be evaluated. Engineering analyses will be performed to develop design and <br />construction recommendations that will be presented in a geotechnical investigation report. <br />1.2 — Horizontal Control Plans <br />DEA will prepare a 1 " = 20'scale horizontal and vertical control plan for the project depicting a survey <br />control line and dimensions to pertinent site features for use in the layout of the park and site features during <br />construction. <br />Deliverables: 1 " = 20'scale horizontal and vertical control plan. <br />L3 - Grading and Drainage Plan <br />DEA will prepare a 1 "= 20' scale precise grading, drainage and paving plan for the project depicting grading <br />contours, slopes, finish surface elevations, drainage patterns, swales, typical cross sections, details and <br />proposed civil related improvements including pavement, hardscape flatwork and access ramps. The plan will <br />consider ADA requirements for accessibility. <br />Deliverables: 1" = 20'scale grading and drainage plan. <br />L4 — Composite Storm Drain and Water Plan <br />DEA will prepare a 1 "= 20'scale composite storm drain and water plan for the project depicting proposed storm <br />drain and domestic water pipe alignments and structures required to service the project site. <br />Deliverables: 1" = 20'scale composite storm drain and domestic water plan. <br />L5 - Erosion Control Plan <br />This plan will include the preparation of erosion control measures for use in construction to reduce sediment <br />transport within the site. <br />Deliverables: 1 " = 20' erosion control plan as noted above. <br />1.6 - Final WQMP <br />DEA will prepare finalize the conceptual WQMP. <br />Deliverables: Finalized WQMP. <br />David Evans and Associates, Inc. I February 28, 2023 1 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.